ECCC GENERAL ENGINEERING EXAM
WITH CORRECT QUESTIONS AND
ANSWERS 2025
Construction Duration Classifications - CORRECT-ANSWERSContingency classifications:
Organic (up to 90 days), Initial (6 months), Temporary (5 years), Semi-permanent (2-10 Years)
Enduring Classification: permanent (5 years or longer)
When making a road, what is the reason that more than one layer or material is used? -
CORRECT-ANSWERSSave money because top layers cost more
Layers of a road - CORRECT-ANSWERSSurface
Base course
Sub base
select materials
compacted subgrade
, Two levels of quality control - CORRECT-ANSWERSUnit quality management program and
project quality management program
What are CDRs of construction units responsible for? - CORRECT-ANSWERSEstablishing and
using a company quality management program
performance work statement - CORRECT-ANSWERSa part of the Statement of Work that is
performance based and directly explains what the contractor is going to do
Steps to clearing and repairing a crater on the minimum operating strip (MOS) - CORRECT-
ANSWERS1. Clear area of debris (Air field clearance team with chem lights, e tools, etc) Clear
20 ft.
2. Conduct profile measurements. ID area of upheaval using line of sight method and
stanchions parallel to runway surface.
3. Remove debris with IHMEE, shovel or other dig asset.
4. Sort debris and stockpile away from MOS (30 ft away, no higher than 3 feet to ensure aircraft
clearance)
WITH CORRECT QUESTIONS AND
ANSWERS 2025
Construction Duration Classifications - CORRECT-ANSWERSContingency classifications:
Organic (up to 90 days), Initial (6 months), Temporary (5 years), Semi-permanent (2-10 Years)
Enduring Classification: permanent (5 years or longer)
When making a road, what is the reason that more than one layer or material is used? -
CORRECT-ANSWERSSave money because top layers cost more
Layers of a road - CORRECT-ANSWERSSurface
Base course
Sub base
select materials
compacted subgrade
, Two levels of quality control - CORRECT-ANSWERSUnit quality management program and
project quality management program
What are CDRs of construction units responsible for? - CORRECT-ANSWERSEstablishing and
using a company quality management program
performance work statement - CORRECT-ANSWERSa part of the Statement of Work that is
performance based and directly explains what the contractor is going to do
Steps to clearing and repairing a crater on the minimum operating strip (MOS) - CORRECT-
ANSWERS1. Clear area of debris (Air field clearance team with chem lights, e tools, etc) Clear
20 ft.
2. Conduct profile measurements. ID area of upheaval using line of sight method and
stanchions parallel to runway surface.
3. Remove debris with IHMEE, shovel or other dig asset.
4. Sort debris and stockpile away from MOS (30 ft away, no higher than 3 feet to ensure aircraft
clearance)