100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

ENG1504 Assignment 1 (100% ANSWERS) Semester 2 2025 - DUE August 2025

Beoordeling
-
Verkocht
-
Pagina's
6
Cijfer
A+
Geüpload op
15-07-2025
Geschreven in
2024/2025

ENG1504 Assignment 1 (100% ANSWERS) Semester 2 2025 - DUE August 2025..... enn1504 ... Soshangana township is situated in the rural areas of Bakwena Municipality. Since the dawn of democracy, the community has faced several challenges related to poor service delivery such as lack of water, and unmaintained streets. Despite several attempts to engage the Ward Councillor and Municipal Manager by the Civic Organisation members, there has not been significant changes to improve service delivery in the township. The scarcity of water led to many households procuring water from nearby villages which led them to be cash strapped because most of the residents are unemployed while some are recipients of old-age grants. To find a way forward on the matter, Ms SEMESTER TWO ASSIGNMENT 01 N.B THIS ASSIGNMENT CONTAINS ONE COMPULSORY QUESTIONS 26 Tancred, Chairperson of the Civic Organisation decided to call a meeting to discuss the possible ways to get adequate supply of water in the township. INSTRUCTIONS Below is a transcript (exact words written down) of what was said under the relevant agenda item 2.2 presented in the form of a dialogue. As the Secretary of the Civic Organisation, it is your duty to take minutes during meetings. At this point, the meeting is discussing agenda item 2.2: possible ways to get adequate supply of water in the township. Write minutes of the meeting for agenda 2.2 only. This means that the complete format for minutes is not required. Remember that in taking minutes, we carefully select and summarise information, and make changes to style and grammar. Note that you should not record what each person said in turn. You should use the linear format (in sentences and paragraphs) of minutes. Your minutes should be about 1 page in length. TRANSCRIPT Ms Tancred (chair): Thank you all residents of Soshangana Township. I understand that we have gathered here in a sombre mood. There’s a dark cloud hanging over our heads regarding poor service delivery in our township. To be specific, let’s move to agenda item 2.2 possible ways of getting adequate water supply in the township. Can I please request our deputy chairperson, Mr Muzila to refresh our minds about this heart-breaking matter? Mr Muzila: Ladies and gentlemen, let me update you about the lack of adequate water supply in our township that is making our lives miserable and does not seem to be attended to. The civic organisation held several meetings with Mr Malatjie, the Municipal Manager, and Comrade Vusani, the Ward Councillor to request for the supply of water in the township. We held our first meeting with them on 30 May 2023 and on 25 June 2024 we were promised that there was a plan to construct two reservoirs and connect main pipeline from Naledi dam that would supply water to the township. We were informed that the construction process would commence on 01 November 2024, however, one could say, without any doubt that these were empty promises. ENG1504/101/3/2025 27 Mevrou Steyn: This is ridiculous, unethical, and irrational! It’s obvious that we are led by irresponsible people-they don’t care about the residents! Let’s go on an indefinite strike and make this municipality ungovernable. Mr Deacon: I disagree with your suggestions, Mevrou Steyn. If we involve ourselves in protests, do you think they will hear us? I sincerely doubt it! How many communities have been involved in protests and their demands were never attended to? Come on, Mevrou, Steyn! Ms Snyman: Ladies and gentlemen, please stop this bickering! It’s not healthy for our conversation. I think we rather start our water project and call it myWater project. This initiative will be intended to raise funds that will help us to provide water for ourselves. Boyza: Good people, this is another form of a scam… a daylight robbery. This is how corruption starts. Naledi water project was supposed to provide us with water, but here we are, without water. Do you think this newly proposed initiative is going to help us? Comrade Sfiso: I agree with Ms Snyman’s proposal. We should drill underground water for our community using the funds we raised. This is the plan,

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
15 juli 2025
Aantal pagina's
6
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ENG1504
Assignment 1 Semester 2 2025
Unique number:
Due date: August 2025
3 DIFFERENT ANSWERS PROVIDED

MINUTES:

Agenda Item 2.2 – Possible Ways to Get Adequate Water Supply in Soshangana
Township

The meeting proceeded with a discussion on agenda item 2.2, where the Chairperson,
Ms Tancred, invited the Deputy Chairperson, Mr Muzila, to provide background on the
township's water crisis. Mr Muzila reported that several meetings had been held with the
Municipal Manager and Ward Councillor between May 2023 and June 2024. Although
they were promised the construction of two reservoirs and a pipeline connection from
Naledi Dam to begin in November 2024, no progress had materialised. The residents
expressed frustration at the unfulfilled promises.




DISCLAIMER & TERMS OF USE
 Educational Aid: These study notes are intended to be used as educational resources and should not be seen
as a replacement for individual research, critical analysis, or professional consultation. Students are encouraged
to perform their own research and seek advice from their instructors or academic advisors for specific
assignment guidelines.
 Personal Responsibility: While every effort has been made to ensure the accuracy and reliability of the
information in these study notes, the seller does not guarantee the completeness or correctness of all content.
The buyer is responsible for verifying the accuracy of the information and exercising their own judgment when
applying it to their assignments.
 Academic Integrity: It is essential for students to maintain academic integrity and follow their institution's
policies regarding plagiarism, citation, and referencing. These study notes should be used as learning tools and
sources of inspiration. Any direct reproduction of the content without proper citation and acknowledgment may
be considered academic misconduct.
 Limited Liability: The seller shall not be liable for any direct or indirect damages, losses, or consequences
arising from the use of these notes. This includes, but is not limited to, poor academic performance, penalties, or
any other negative consequences resulting from the application or misuse of the information provided.

, 3 DIFFERENT ANSWERS PROVIDED

MINUTES:

Agenda Item 2.2 – Possible Ways to Get Adequate Water Supply in
Soshangana Township

The meeting proceeded with a discussion on agenda item 2.2, where the
Chairperson, Ms Tancred, invited the Deputy Chairperson, Mr Muzila, to provide
background on the township's water crisis. Mr Muzila reported that several meetings
had been held with the Municipal Manager and Ward Councillor between May 2023
and June 2024. Although they were promised the construction of two reservoirs and
a pipeline connection from Naledi Dam to begin in November 2024, no progress had
materialised. The residents expressed frustration at the unfulfilled promises.

Mevrou Steyn called for an indefinite strike; however, Mr Deacon discouraged this
route, questioning the effectiveness of protests. Ms Snyman proposed a community-
led initiative called myWater project, which aimed to raise funds for local water
provision. While some members voiced distrust in the plan, Comrade Sfiso
supported it and outlined a step-by-step proposal to drill boreholes using community-
raised funds.

Mandla and other attendees welcomed the idea. It was agreed that one borehole
would be drilled per township section (four in total), with two 5000-litre tanks
connected to each. One resident per section would be employed to maintain the
structure and ensure water supply.

Mr Muzila recommended forming a steering committee to lead the myWater project.
The following members were nominated and unanimously accepted:

 Chairperson: Ms Hlabangane

 Treasurer: Boyza

 Secretary: Mama Dikeledi

 Additional Member: Mr Smangaliso

The Chairperson clarified the committee’s responsibilities. Ms Hlabangane will report
on project progress, Boyza will oversee the opening of a fundraising bank account,

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EdithNcobgo AAA School of Advertising
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
167
Lid sinds
5 jaar
Aantal volgers
1
Documenten
157
Laatst verkocht
2 weken geleden

4,6

24 beoordelingen

5
18
4
2
3
4
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen