A business scenario is a description of a business situation or problem that describes what 3 things? correct answer past events that are relevant current key information expected or desired outcomes A Gantt chart is an example of a __________ tool. Collaboration Scheduling correct answer Scheduling Correct! Project managers use Gantt charts in the process of scheduling. A project is successful if it meets the triple constraints of what 3 things? correct answer scope, schedule, and budget A project is successful if it meets What triple constraints? correct answer 1. the project delivered what was specified in the project scope

Meer zien Lees minder
Instelling
Project Managememt
Vak
Project Managememt











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Project Managememt
Vak
Project Managememt

Documentinformatie

Geüpload op
2 juli 2025
Aantal pagina's
35
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Project Management - C722 (Unit
2) Questions with Accurate
Answers
A business scenario is a description of a business situation or problem
that describes what 3 things? correct answer past events that are
relevant


current key information


expected or desired outcomes


A Gantt chart is an example of a __________ tool.
Collaboration
Scheduling correct answer Scheduling


Correct! Project managers use Gantt charts in the process of
scheduling.


A project is successful if it meets the triple constraints of what 3 things?
correct answer scope, schedule, and budget


A project is successful if it meets What triple constraints? correct
answer 1. the project delivered what was specified in the project scope

,2. The project was within the allotted amount of time


3. The Project was for the specified funding


According to OPM3, what takes place during the fifth and final level of
project management maturity?


Technologies and reporting are sporadic.


Metrics are put in place to collect performance data.


Lessons and best practices are applied correct answer Lessons and best
practices are applied.


Correct! The lessons learned and best practices are applied in the fifth
and final level of project management maturity.


Define Operations correct answer the ongoing, daily activities of an
organization that produce revenue and expense


Define program. correct answer a group of initiatives that support the
long-term goals and objectives of the company; it may be established
and is a group of related projects

,Define project? correct answer a temporary endeavor with a specified
start and end date


Google Drive is an example of what?




A scheduling tool


A social networking site


A collaboration site


Certification platform correct answer A collaboration site


Correct! Google Drive is a work collaboration site


In addition to the triple constraints, what other considerations may
determine if the project is successful?


A. The project is a project of high interest to the CEO.

, B. There are no government regulations that affect the product of the
project.


C. The requirements in the scope adequately define the project's
objectives. correct answer C. The requirements in the scope adequately
define the project's objectives.


Correct! The scope requirements should adequately define project
objectives


In which way can conflict be an opportunity for a project?


It can reveal something critical about the project.


It can help to establish expectations.


It can assure aggressive deliverable schedules. correct answer It can
reveal something critical about the project.


Correct! Conflict can teach the project manager and team members
something critical about the project that was not previously known.


One of the project manager's tools for communicating is the 8 and 80
Rule. What does the number 80 refer to in this rule?

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
starwid Yale University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
13
Lid sinds
6 maanden
Aantal volgers
1
Documenten
8138
Laatst verkocht
4 dagen geleden

3,3

4 beoordelingen

5
1
4
0
3
2
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen