100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CPSWQ Exam Questions With Already Solved Correctly Answers

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
24-06-2025
Geschreven in
2024/2025

CPSWQ Exam Questions With Already Solved Correctly Answers

Instelling
CPSWQ
Vak
CPSWQ









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CPSWQ
Vak
CPSWQ

Documentinformatie

Geüpload op
24 juni 2025
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CPSWQ Exam Questions With Already
Solved Correctly Answers
Cornerstone Fundamental Principles CORRECT ANSWERS Integrity, Objectivity,
Confidentiality, Competence, Professionalism

Establishment of Phase II and Permits CORRECT ANSWERS Phase II established in
1999, permits began in 2003

6 Minimum Control Measures CORRECT ANSWERS SWMPs for Stormwater
Management Programs: Public Outreach, Public Involvement, Illicit Discharge
Detection, Construction Runoff Control, Post Construction Management, Pollution
Prevention

Federal Water Pollution Control Act CORRECT ANSWERS Established in 1948 as
framework for CWA, amended in 1972

Purpose of NPDES CORRECT ANSWERS Control discharges of pollutants from point
sources

POTW Definition CORRECT ANSWERS Publicly Owned Treatment Works

NURP and Discoveries CORRECT ANSWERS National Urban Runoff Program (1978-
1983) characterized stormwater pollutants from residential, commercial, and light
industrial areas, discovered common pollutants

Section 402 Categories CORRECT ANSWERS Facilities under NPDES permit,
Facilities with industrial activity, Large MS4 Systems, Medium MS4 Systems, Facilities
contributing to poor water quality

Section 404 Description CORRECT ANSWERS Outlines Dredge/Fill permitting

CZARA Meaning CORRECT ANSWERS Coastal Zone Act Reauthorization
Amendments - States with coastal zone jurisdiction must develop non-point pollution
control plan

Stormwater Discharges CORRECT ANSWERS Any conveyance like a pipe, ditch, or
channel where pollutants are discharged.

Waters of the US CORRECT ANSWERS -Waters used for commerce, interstate waters,
wetlands, intrastate waters, tributaries, Territorial Sea, and wetlands adjacent to US
waters.

, Exclusions from Waters of the US CORRECT ANSWERS Waste treatment systems
meeting CWA requirements.

Construction Activities Requiring NPDES Permit CORRECT ANSWERS Disturbing >5
acres (Phase I) or 1-5 acres (Phase II), or construction with heavy equipment impacting
water quality.

NPDES Permit Application CORRECT ANSWERS Operator of construction site (owner
if operator not identified).

Phase II Coverage CORRECT ANSWERS Commercial, retail, light industrial,
institutional facilities, construction <5 acres, and MS4 systems <100k population.

Phase II Exemptions CORRECT ANSWERS Oil and Gas Operators, Silviculture,
Agriculture (crop production only).

Phase II Requirements CORRECT ANSWERS Submit NOI, develop SWPPP with
BMPs, submit NOT when site is present.

Phase II Waivers CORRECT ANSWERS Low predicted rainfall, TMDL established by
EPA, or pollutant not detrimental to water quality.

Municipalities under Phase II CORRECT ANSWERS Develop SWMP, implement 6
control measures, reduce discharges with BMPs, evaluate program effectiveness,
reduce pollutant discharges to MEP.

Purpose of the Clean Water Act (CWA) CORRECT ANSWERS Designed to protect the
beneficial uses of surface waters and requires states to adopt water quality standards.

Requirements of Water Quality Standards CORRECT ANSWERS 1. Include provisions
for restoring, maintaining the chemical, physical, and biological integrity of state waters.
2. Achieve a level of water quality that provides for the protection and propagation of
fish and wildlife, as well as recreation. 3. Consider the use and value of state waters
(ecosystem services).

Explanation of Section 303d CORRECT ANSWERS Establishes the Total Maximum
Daily Load (TMDL) procedure.

Steps for TMDL Development CORRECT ANSWERS 1. Identify quality-limited waters.
2. Establish priority waters/watersheds. 3. Determine the pollutant of concern and the
daily load the waterbody can handle without degrading water quality.

Definition of Total Maximum Daily Load (TMDL) CORRECT ANSWERS Maximum
amount of a particular pollutant that a water body can assimilate on a daily basis without
degrading water quality.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ElevatedExcellence Exam
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
897
Lid sinds
3 jaar
Aantal volgers
504
Documenten
18038
Laatst verkocht
3 dagen geleden
GETSOCIO EDUCATION

We have launched our assignments at a very reasonable price so that every student can enjoy its features. Our new method is gathering quite a positive feedback from the students, and many of our alumnus are fully satisfied with it. We would be glad if you purchase from us. THANK YOU!!

3,8

171 beoordelingen

5
77
4
36
3
27
2
10
1
21

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen