ICC Soils General (GR) Part 3 Q & A A SI does not need basic knowledge of - Correct Answer - structural design What is not required of the SI prior to arriving on site - Correct Answer - Meet with contractor Which of the following circumstances warrants contacting the contractor immediately: - Correct Answer - the concrete temperature is over 90 degrees F Who is responsible for reviewing and approving special inspection reports? - Correct Answer - the Building Official (BO) The reports of a technical finding are approved by... - Correct Answer - the Building Official (BO) The statement of special inspections is prepared by the ____ and approved by the ___. - Correct Answer - RDP; BO Which of the following is used to approve a building material not listed in the IBC - Correct Answer - a technical evaluation Who performs structural observations? - Correct Answer - RDP When should the SI immediately notify the contractor? - Correct Answer - When the rebar is not tied correctly A preconstruction meeting is generally conducted by the - Correct Answer - RDP Which of the following does not need to be put in a special inspection report? - Correct Answer - time of inspection The contractor signs a statement of - Correct Answer - responsibility Who signs the special inspection agreement? - Correct Answer - Owner, Special Inspector, and the Contractor Who hires the contractor? - Correct Answer - The owner When can inspections of fabricators be waived? - Correct Answer - When approved by the BO Who is allowed to hire the special inspector? - Correct Answer - RDP and Owner Who administers the special inspection program? - Correct Answer - the Building Department

Meer zien Lees minder
Instelling
ICC REINFORCED CONCRETE
Vak
ICC REINFORCED CONCRETE








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ICC REINFORCED CONCRETE
Vak
ICC REINFORCED CONCRETE

Documentinformatie

Geüpload op
21 mei 2025
Aantal pagina's
2
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ICC Soils General (GR) Part 3 Q & A
A SI does not need basic knowledge of - Correct Answer - structural design

What is not required of the SI prior to arriving on site - Correct Answer - Meet with contractor

Which of the following circumstances warrants contacting the contractor immediately: - Correct
Answer - the concrete temperature is over 90 degrees F

Who is responsible for reviewing and approving special inspection reports? - Correct Answer -
the Building Official (BO)

The reports of a technical finding are approved by... - Correct Answer - the Building Official (BO)

The statement of special inspections is prepared by the ____ and approved by the ___. -
Correct Answer - RDP; BO

Which of the following is used to approve a building material not listed in the IBC - Correct
Answer - a technical evaluation

Who performs structural observations? - Correct Answer - RDP

When should the SI immediately notify the contractor? - Correct Answer - When the rebar is not
tied correctly

A preconstruction meeting is generally conducted by the - Correct Answer - RDP

Which of the following does not need to be put in a special inspection report? - Correct Answer -
time of inspection

The contractor signs a statement of - Correct Answer - responsibility

Who signs the special inspection agreement? - Correct Answer - Owner, Special Inspector, and
the Contractor

Who hires the contractor? - Correct Answer - The owner

When can inspections of fabricators be waived? - Correct Answer - When approved by the BO

Who is allowed to hire the special inspector? - Correct Answer - RDP and Owner

Who administers the special inspection program? - Correct Answer - the Building Department
€7,51
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
gurutech

Maak kennis met de verkoper

Seller avatar
gurutech Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
7 maanden
Aantal volgers
0
Documenten
63
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen