Construction FE Civil Exam Questions and Answers 100% Pass Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this method, the owner contracts designers and builders separately. - Design-bid-build is a construction project delivery method where the designer and builder work together under a single contract from the beginning of the project in order to ensure unity and collaboration throughout the process. - Design- build Select all that clearly demonstrate an advantage of the Design-Build project delivery over the Design-Bid-Build approach: - There is single point of contractual responsibility for the owner for the entire project 2 Katelyn Whitman, All Rights Reserved © 2025 -There are contractual relationships with the Owner that prevent a conflict of interest -The design is clearly and explicitly defined at the outset of the project - The design includes significant collaboration between the Engineer and the Contractor -The schedule can be fast-tracked and construction can begin before the complete project design is finalized - The Owner will receive a project at the lowest competitive cost - There is single point of contractual responsibility for the owner for the entire project There is single point of contractual responsibility for the owner for the entire project The schedule can be fast-tracked and construction can begin before the complete project design is finalized 3 Katelyn Whitman, All Rights Reserved © 2025 An indemnification clause in an engineer's design contract is typically tied to: A. Negligent engineering design B. Claims submitted by parties affected by a failure C. Project cost overruns D. Improper construction methods by the Contractor - A. Negligent engineering design Collusion on a construction project typically refers to which of the following? A. A practice where multiple contractors conspire to fix prices or rig bids B. A system where public officials receive money from the contractor after award C. Falsely increasing the price of change order 4 Katelyn Whitman, All Rights Reserved © 2025 D. Misrepresenting the amount of work that has been completed to get advance payments - A. A practice where multiple contractors conspire to fix prices or rig bids A preconstruction conference should be he held: A. Prior to advertising for bids B. After advertising for bids but before bids are received C. After bid opening but before award of the contract D. After execution of an agreement but before Notice to Proceed - D. After execution of an agreement but before Notice to Proceed Types of submittals for engineer approval typically include all the following except: A. Product data B. Shop drawings C. Installation means and methods 5 Katelyn Whitman, All Rights Reserved © 2025 D. Mill certificates - C. Installation means and methods Which of the following statements best define what is meant by "substantial completion" with respect to a construction contract? A. Project can be used and occupied by the owner and is completely finished B. Project can be used and occupied by the owner but there is still a punch-list of minor work remaining C. Contractor's performance bond will be used to finish the remaining work D. The owner has received a final release of liens from all subcontractors - B. Project can be used and occupied by the owner but there is still a punch-list of minor work remaining a financial guarantee that the terms of a contract will be honored. If one party to a contract cannot complete their obligations, the bond is paid out to the other party to compensate for their damages or costs. - Performance bond 6 Katelyn Whitman, All Rights Reserved © 2025 OSHA requires trench protection systems be installed for the safety of workers: A. Whenever a trench is dug and workers will be working in the trench B. For trenches 5 feet deep or greater unless the trench is made entirely in stable rock C. When the work in the trench will exceed four hours D. Only if the trench is 8 feet deep or greater or 20 feet long or greater - B. For trenches 5 feet deep or greater unless the trench is made entirely in stable rock The basic responsibility for planning the means and methods of construction is that of the

Meer zien Lees minder
Instelling
FE Civil
Vak
FE Civil











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
FE Civil
Vak
FE Civil

Documentinformatie

Geüpload op
16 maart 2025
Aantal pagina's
36
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Construction FE Civil Exam Questions
and Answers 100% Pass


Is the most traditional project delivery method and appeals to those

looking for low-cost bids. In this method, the owner contracts designers

and builders separately. - ✔✔Design-bid-build


is a construction project delivery method where the designer and builder

work together under a single contract from the beginning of the project in

order to ensure unity and collaboration throughout the process. -

✔✔Design- build


Select all that clearly demonstrate an advantage of the Design-Build project

delivery over the Design-Bid-Build approach:




- There is single point of contractual responsibility for the owner for the

entire project


1
Katelyn Whitman, All Rights Reserved © 2025

,-There are contractual relationships with the Owner that prevent a conflict

of interest


-The design is clearly and explicitly defined at the outset of the project


- The design includes significant collaboration between the Engineer and

the Contractor


-The schedule can be fast-tracked and construction can begin before the

complete project design is finalized


- The Owner will receive a project at the lowest competitive cost - ✔✔There

is single point of contractual responsibility for the owner for the entire

project




There is single point of contractual responsibility for the owner for the

entire project




The schedule can be fast-tracked and construction can begin before the

complete project design is finalized



2
Katelyn Whitman, All Rights Reserved © 2025

,An indemnification clause in an engineer's design contract is typically tied

to:




A. Negligent engineering design


B. Claims submitted by parties affected by a failure


C. Project cost overruns


D. Improper construction methods by the Contractor - ✔✔A. Negligent

engineering design


Collusion on a construction project typically refers to which of the

following?




A. A practice where multiple contractors conspire to fix prices or rig bids


B. A system where public officials receive money from the contractor after

award


C. Falsely increasing the price of change order




3
Katelyn Whitman, All Rights Reserved © 2025

, D. Misrepresenting the amount of work that has been completed to get

advance payments - ✔✔A. A practice where multiple contractors conspire

to fix prices or rig bids


A preconstruction conference should be he held:




A. Prior to advertising for bids


B. After advertising for bids but before bids are received


C. After bid opening but before award of the contract


D. After execution of an agreement but before Notice to Proceed - ✔✔D.

After execution of an agreement but before Notice to Proceed


Types of submittals for engineer approval typically include all the

following except:


A. Product data


B. Shop drawings


C. Installation means and methods




4
Katelyn Whitman, All Rights Reserved © 2025
€11,53
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
KatelynWhitman West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1103
Lid sinds
2 jaar
Aantal volgers
482
Documenten
34017
Laatst verkocht
3 dagen geleden
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3,6

239 beoordelingen

5
95
4
39
3
54
2
20
1
31

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen