Management by Objectives - ANSWER1. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: The bulk of the project budget will be spent in the execution phase - ANSWER2. During the full life cycle of the project, a plot of the project's expected expenditures will usually follow a characteristic S curve. This indicates that: Until the divestment of the operations at the end of the product life cycle - ANSWER14. Projects require project management while operations require business process management or operations management. Projects can intersect with operations at various points during the product lifecycle. Which of the following is not a stage to represent this? Chart of Accounts - ANSWER41. Any numbering system that is used to monitor project costs by category such as labor, supplies, or materials, for example, is called: Reviewing the performance of an installed software module - ANSWER42. An example of 'Validate Scope' process is : The original scope of the project plus or minus any scope changes - ANSWER44. A project manager is reviewing the scope of the project and the scope baseline of the project. Which of the following does it include? Assigning work to a specific resource - ANSWER46. When decomposing project work during WBS creation, which of the following activities is not part of the process : Subprojects - ANSWER17. Large projects may be divided into smaller, more manageable components known as, Program manager - ANSWER18. A manager who manages a group of related projects is called a -

Meer zien Lees minder
Instelling
CAPM
Vak
CAPM








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CAPM
Vak
CAPM

Documentinformatie

Geüpload op
1 maart 2025
Aantal pagina's
3
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CAPM Exam Practice Questions &
Answers Correct 100%
Management by Objectives - ANSWER1. The process of establishing clear and
achievable objectives, measuring their achievement, and adjusting performance in
accordance with the results of the measurement is called:

The bulk of the project budget will be spent in the execution phase - ANSWER2.
During the full life cycle of the project, a plot of the project's expected expenditures
will usually follow a characteristic S curve. This indicates that:

Until the divestment of the operations at the end of the product life cycle -
ANSWER14. Projects require project management while operations require business
process management or operations management. Projects can intersect with
operations at various points during the product lifecycle. Which of the following is not
a stage to represent this?

Chart of Accounts - ANSWER41. Any numbering system that is used to monitor
project costs by category such as labor, supplies, or materials, for example, is called:

Reviewing the performance of an installed software module - ANSWER42. An
example of 'Validate Scope' process is :

The original scope of the project plus or minus any scope changes - ANSWER44. A
project manager is reviewing the scope of the project and the scope baseline of the
project. Which of the following does it include?

Assigning work to a specific resource - ANSWER46. When decomposing project
work during WBS creation, which of the following activities is not part of the process :


Subprojects - ANSWER17. Large projects may be divided into smaller, more
manageable components known as,

Program manager - ANSWER18. A manager who manages a group of related
projects is called a -

customer satisfaction survey - ANSWER19. Which of the following activity is
conducted last as part of closing process group?

Initiation and planning - ANSWER21. A stakeholder has the greatest ability to
influence a project during -

Perform Quality Assurance - ANSWER24. Of the following, which is not a process
from the Planning Process Group?
€13,71
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
nursingismylife West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
249
Lid sinds
2 jaar
Aantal volgers
174
Documenten
9127
Laatst verkocht
2 weken geleden

3,6

38 beoordelingen

5
14
4
12
3
3
2
1
1
8

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen