100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SWM DEQ Questions And Correct Answers

Beoordeling
-
Verkocht
-
Pagina's
18
Cijfer
A+
Geüpload op
25-02-2025
Geschreven in
2024/2025

SWM DEQ Questions And Correct Answers

Instelling
VA DEQ SWM
Vak
VA DEQ SWM










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
VA DEQ SWM
Vak
VA DEQ SWM

Documentinformatie

Geüpload op
25 februari 2025
Aantal pagina's
18
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

SWM DEQ Questions And
Correct Answers
The Virginia Stormwater Management Program is
authorized by the ______ and administered through
the ______ - answer Virginia Stormwater
Management Act, Virginia Stormwater
Management Program Regulation


VPDES Permit/Construction GP authorizes
discharge of stormwater from construction
activities that are - answer greater than or equal to
an acre


The Stormwater Management Act requires the
State Water Control Board to - answer permit,
regulate, and control stormwater runoff


DEQ has ___ days to complete review of real or
potential inter-jurisdictional impacts upon request
- answer 90


The Stormwater Management Act requires the
following individuals to obtain and maintain a
certificate of competency - answer staff of a
stormwater program, anyone contracted by a
VSMP authority, standard and specification holders

,The dual certificate will expire three years from -
answer the latest date of the certificates


SWM plan must be approved by ___ before land
disturbance - answer VSMP program authority


The water quality criteria sets a site-based load
limit of ____ of total phosphorus for new
development - answer 0.41 lbs/acre/year


The phosphorus load limit uses the - answer 10%
impervious cover


Part II B and II C water quantity criteria addresses -
answer channel protection and flood protection


Which two plans in the SWPPP must be approved? -
answer SWM plan, ESC plan


Does the SWM plan address runoff during or after
construction? - answer post-construction


What is the lower limit of the range of
imperviousness that can result in stream
degradation? - answer 10%

, What do land disturbing activities consist of? -
answer excavating, clearing, grading


LDA threshold for the SWM Act and Regulation -
answer 1 acre or 2500 square feet for Chesapeake
Bay Preservation Act


In situations where an initial exemption was
applicable because LDAs were related to
emergency work, VSMP authority shall be advised
of the disturbance within - answer 7 days of
commencing the LDA and shall submit a permit
application within 30 days of starting the land-
disturbing activity


Localities with MS4 - answer must adopt and
administer a stormwater program


Localities without MS4 - answer may choose to
administer a VSMP or have DEQ administer the
program


DEQ is responsible for enforcing the ____ while
locality ____ are responsible for enforcing local
ordinances - answer Construction GP, VSMP

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
BRAINBOOSTERS Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
667
Lid sinds
2 jaar
Aantal volgers
250
Documenten
23255
Laatst verkocht
2 uur geleden

In this page you will find all documents , flashcards and package deals offered by seller BRAINBOOSTERS

4,5

341 beoordelingen

5
265
4
30
3
21
2
5
1
20

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen