SWM301_FE_SU19 UPDATED ACTUAL Exam Questions and CORRECT Answers 1. Human is considered as a non-financial resource. The statement is ____ A. TRUE B. FALSE - CORRECT ANSWER - A 2. Contract negotiation and requirement analyzing are mainly included in which stage of following ones?

Meer zien Lees minder
Instelling
DEQ
Vak
DEQ










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
DEQ
Vak
DEQ

Documentinformatie

Geüpload op
16 februari 2025
Aantal pagina's
18
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

SWM301_FE_SU19 UPDATED ACTUAL
Exam Questions and CORRECT Answers
1. Human is considered as a non-financial resource. The statement is ____
A. TRUE

B. FALSE - CORRECT ANSWER -A


2. Contract negotiation and requirement analyzing are mainly included in which stage of
following ones?
A. Initiation
B. Definition
C. Transition
D. Termination

E. Construction - CORRECT ANSWER -B


3. Which is NOT True with a Scrum team?
A. A Scrum Team will always have 8-10 members.
B. A Scrum Team should be in place before the project is initiated.
C. A Scrum Team will create the deliverables of the project
D. A Scrum Team will determine the length of Sprint in a project. - CORRECT
ANSWER -B


4. It is always ____ to determine which is covered in project scope.
A. Easy
B. Hard

C. Not necessary - CORRECT ANSWER -B


5. Suppose you have a budgeted cost of a project at $900,000. The project is to be completed in 9
months. After a month, you have completed 10% of the project at a total expense of $100,000.

,The planned completion should have been 15%. At the current progress rate, how much more
money is required to complete the project?
A. $ 800,000
B. $ 900,000
C. $ 1,000,000

D. $ 1,100,000 - CORRECT ANSWER -B


6. A project would NOT be terminated by which of the following reason?
A. Lack of team synergy necessary to achieve top quality.
B. The project no longer meets the company's objectives.
C. The resources are not available to complete project activities.

D. Project funding has been significantly reduced. - CORRECT ANSWER -A


7. Retrospect Sprint Meeting is ____
A. The meeting which is conducted at the end of a Sprint to plan for the next sprint.
B. The meeting which is conducted at the end of a Sprint to analyze improvement opportunities
for the future Sprints
C. The meeting which is conducted at the beginning of a Sprint to introduce the plan for the
Sprint.
D. The meeting which is conducted at the beginning of a Sprint to explain which improvements
will be applied in the Sprint. - CORRECT ANSWER -b


8. What is the first step in project management?
A. Organizing the project budget.
B. Writing the project objectives.
C. Defining the project.

D. Building a project team. - CORRECT ANSWER -C


9. A document called ____________ is created by decomposing the project scope into smaller,
more manageable elements.

, A. Scope Statement
B. Network Logic Diagram
C. Work Breakdown Structure

D. Requested Change - CORRECT ANSWER -C


10. When creating a preliminary timeline, which process is recommended?
A. Use a program that can create a Gantt chart.
B. Do this activity alone.
C. Use a manual process and involve the team.

D. None of the others. - CORRECT ANSWER -C


11. In human resource procuring, which is NOT a step in the process?
A. Define the type of resources
B. Estimate how much time you will need
C. Validate the availability of the people you need
D. Assign roles and responsibilities to them

E. Find and force people work for you correct - CORRECT ANSWER -E


12. Which of the following is an example of an acceptable task statement?
A. "Plan."
B. "Project planning."
C. "Prepare the formal project plan."

D. "Project management." - CORRECT ANSWER -C


13. Contingency plans should include
A. Possible risks to project.
B. Plans to deal with problems that arise.
C. Person responsible for contingencies.
€10,17
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1091
Lid sinds
1 jaar
Aantal volgers
102
Documenten
68972
Laatst verkocht
2 uur geleden
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3,8

175 beoordelingen

5
75
4
31
3
46
2
8
1
15

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen