100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

LEED Exam #1 ExamQuestions andAnswers(100% Guaranteed Pass)

Beoordeling
-
Verkocht
-
Pagina's
16
Cijfer
A+
Geüpload op
07-12-2024
Geschreven in
2024/2025

LEED Exam #1 ExamQuestions andAnswers(100% Guaranteed Pass)How many levels of LEED certification are there?  four What is the minimum number of points that a LEED for Schools project must achievetobe certified LEED Gold?  60 LEED BD+C bonus credit categories are? [Choose two]  Innovation in Design Regional Priority When designing a green building to address environmental, financial, and occupant satisfaction issues what type of approach to sustainable design should the teamuse? Integrated The triple bottom line concept incorporates a long-term view for assessing potential effects and best practices for what resources? [Choose three]  Planet Profit People Buildings and land-use are responsible for contributing to climate change due towhichof these environmental impacts?  Greenhouse Gas Emissions LEED is an abbreviation for?  Leadership in Energy and Environmental Design Which of these is a LEED main credit category? [Choose two]  Sustainable Sites Indoor Environmental Quality AGRADESTUVIA STORE 2025 ALL THE BEST AGRADESTUVIA STORE 2 DO NOT COPYWhat are the benefits of having at least one charrette early in the design of a LEEDproject? [Choose two]  Helps the team to establish green goals Possible designs for greening a space can be identified What deliverables should come from the initial project team meeting? [Choosetwo]  Project checklist LEED certification level Designers working to achieve a project's green building goals should work usingwhat type of building process?  Integrated What tool is used at the initial project team meeting to determine the possible LEEDcredits the project can earn and the level of project LEED Certification?  Project Checklist A 3-story commercial office building is being constructed on land that previously hadagas station on it. What type of site is this?  Previously developed What are the two approaches to certifying multiple buildings under the campus program? [Choose two]  Group Approach Campus Approach Which of these is the first phase in the integrative process?  Discovery Where can the project team members find the LEED scorecard?  LEED Online In LEED credits how is density measured? [Choose two]  Floor-area ratio (FAR) Dwelling units per acre (DU/acre) AGRADESTUVIA STORE 2025 ALL THE BEST AGRADESTUVIA STORE 3 DO NOT COPYIf a 10,000 sf building is on a 20,000 sf site, what is the floor-area ratio?  0.5 Which of these is considered a regular building occupant? [Choose two]  Staff Residents For a LEED for New Construction project what percentage of the certifying grossfloor area of a LEED project may consist of incomplete space?  40% Which of these are quantitative indicators of sustainable performance for LEEDprojects? [Choose three]  Reduction in GHG emissions Annual gallons of water saved Vehicle miles travelled reduced Currently, there are how many different rating systems families within LEED?  Five: BD+C, O+M, ID+C, ND, and Homes Generally held at the beginning of the project, what process brings together theproject team with stakeholders and outside experts for creative thinking and collaborationandto assist in establishing goals?  Charrette Integrative project team members such as the contractors, vendors, tradespeople, andother stakeholders, come together at what point in the design process to first discussthe project:  Before schematic design begins A regular building occupant who spends 40 hours a week in the project buildingisdescribed as an FTE which stands for:  Full-time equivalent AGRADESTUVIA STORE 2025 ALL THE BEST AGRADESTUVIA STORE 4 DO NOT COPYA property whose use may be complicated by the presence or possible presenceof ahazardous substance, pollutant or contaminant is called a:  Brownfield Ongoing Improvements to LEED, which are based on principles of transparency, openness, and inclusiveness, involve volunteer committees and working groups aswell as USGBC staff, and are approved by a:  Membership-wide vote Building sites that once housed buildings, roadways, parking lots, or were gradedor otherwise altered by human activities are called:  Previously developed/disturbed sites The four certification levels of the LEED rating system are:  Certified, Silver, Gold, Platinum How often must a LEED O&M project submit for recertification?  Every five years You are targeting LEED NC and you can only achieve 6 of the 8 prerequisites. Whichof these statements is true?  Project cannot achieve LEED certification Where do you find the project Scorecard?  LEED Online Identify the primary goals of the LEED MPRs.  Give clear guidance to customers Protect the integrity of the LEED program Reduce complications that occur during the LEED certification process What is the minimum floor area requirement for New Construction, CoreandShell, Schools, ExistingBuildings:O&M?  1,000 square feet of gross floor area AGRADESTUVIA STORE 2025 ALL THE BEST AGRADESTUVIA STORE 5 DO NOT COPYA mixed use project located in a downtown urban area will consist of undergroundparking, retail on the first two levels, and twelve floors of condominiums. What LEED rating system should you recommendthe project use?  LEED BD+C: New Construction and Major Renovations What is an FTE?  A regular building occupant who spends 40 hours per week in the project buildingA LEED certified hotel that is 200,000 SF is applying for LEED O&M. Part of thebuildingis owned by a private party conference center. How big can the conference center besothat the hotel can earn LEED O&M certification?  This is a multitenant building and is not certifiable What are LEED Credit weightings based on?  Environmental impacts and human benefits The number of points assigned to each credit In the LEED rating systems is determinedby the:  Credit's ranking on USGBC's list of seven impact categories A k-12 school is building a new library on their campus. What LEED rating systemwould you recommend that they use?  LEED BD+C: Schools LEED v4 addresses different market sector adaptations, including newandexistingdata centers, new and existing warehouse and distribution centers, hospitality, existingschools, existing retail, and multifamily midrise.  21 LEED's goals are referred to as:  Impact Categories Certification begins with selection and project  Rating system Registration AGRADESTUVIA STORE 2025 ALL THE BEST AGRADESTUVIA STORE 6 DO NOT COPYWhen submitted for certification, a project goes through and reviews.  Prelimin

Meer zien Lees minder
Instelling
LEED
Vak
LEED










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
LEED
Vak
LEED

Documentinformatie

Geüpload op
7 december 2024
Aantal pagina's
16
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

AGRADESTUVIA STORE 2025 ALL THE BEST




LEED Exam #1 Exam Questions and Answers
(100% Guaranteed Pass)

How many levels of LEED certification are there?
 four


What is the minimum number of points that a LEED for Schools project must achieve to
be certified LEED Gold?
 60


LEED BD+C bonus credit categories are? [Choose two]
 Innovation in Design
Regional Priority


When designing a green building to address environmental, financial, and occupant
satisfaction issues what type of approach to sustainable design should the team use?
 Integrated


The triple bottom line concept incorporates a long-term view for assessing potential
effects and best practices for what resources? [Choose three]
 Planet
Profit
People


Buildings and land-use are responsible for contributing to climate change due to which
of these environmental impacts?
 Greenhouse Gas Emissions


LEED is an abbreviation for?
 Leadership in Energy and Environmental Design


Which of these is a LEED main credit category? [Choose two]
 Sustainable Sites
Indoor Environmental Quality




AGRADESTUVIA STORE 1 DO NOT COPY

,AGRADESTUVIA STORE 2025 ALL THE BEST



What are the benefits of having at least one charrette early in the design of a LEED
project? [Choose two]
 Helps the team to establish green goals
Possible designs for greening a space can be identified



What deliverables should come from the initial project team meeting? [Choose two]
 Project checklist
LEED certification level


Designers working to achieve a project's green building goals should work using what
type of building process?
 Integrated


What tool is used at the initial project team meeting to determine the possible LEED
credits the project can earn and the level of project LEED Certification?
 Project Checklist


A 3-story commercial office building is being constructed on land that previously had a
gas station on it. What type of site is this?
 Previously developed


What are the two approaches to certifying multiple buildings under the campus
program? [Choose two]
 Group Approach
Campus Approach


Which of these is the first phase in the integrative process?
 Discovery


Where can the project team members find the LEED scorecard?
 LEED Online


In LEED credits how is density measured? [Choose two]
 Floor-area ratio (FAR)
Dwelling units per acre (DU/acre)




AGRADESTUVIA STORE 2 DO NOT COPY

, AGRADESTUVIA STORE 2025 ALL THE BEST



If a 10,000 sf building is on a 20,000 sf site, what is the floor-area ratio?
 0.5




Which of these is considered a regular building occupant? [Choose two]
 Staff
Residents


For a LEED for New Construction project what percentage of the certifying gross floor
area of a LEED project may consist of incomplete space?
 40%


Which of these are quantitative indicators of sustainable performance for LEED
projects? [Choose three]
 Reduction in GHG emissions
Annual gallons of water saved
Vehicle miles travelled reduced


Currently, there are how many different rating systems families within LEED?
 Five: BD+C, O+M, ID+C, ND, and Homes


Generally held at the beginning of the project, what process brings together the project
team with stakeholders and outside experts for creative thinking and collaboration and
to assist in establishing goals?
 Charrette


Integrative project team members such as the contractors, vendors, tradespeople, and
other stakeholders, come together at what point in the design process to first discuss
the project:
 Before schematic design begins


A regular building occupant who spends 40 hours a week in the project building is
described as an FTE which stands for:
 Full-time equivalent




AGRADESTUVIA STORE 3 DO NOT COPY

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Agradestuvia CHAMBERLAIN COLLEGE OF NURSING
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
4 jaar
Aantal volgers
73
Documenten
1500
Laatst verkocht
1 week geleden
Verified and Graded A Material and Latest Updated Documents from all courses just for you!! store

On this page, you find all documents, package deals, and flashcards offered by seller agradestuvia. I know how frustrating it can get with all those assignments mate. Nursing Being my main profession line, I have essential guides that are A graded, I am a very friendly person so don\'t hesitate to ask anything that will enable you pass you exams. GOOD LUCK IN YOUR STUDIES .

4,1

30 beoordelingen

5
15
4
6
3
7
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen