RF3701 ASSIGNMENT 06 SEMESTER 02 ANSWERS DUE 01 OCTOBER 2024 1.1. Discuss five constraints, besides a project budget, that a project manager must balance to successfully complete a project(5 marks). 1.2. Describe each phase of the project life cycle, referring to two core activities that usually occur in each phase. (10 marks). The Department of Business Management has developed a plan for a business clinic project in the conference rooms of four selected hotels in Mamelodi Township. The workshops aim to benefit 400 small business owners, facilitated by lecturers and postgraduate students, running 8 hours a day (except weekends) during September 2017. Business skills will be developed, marketing support will be provided, and business manuals and starter packs will be distributed to attendees. The objective is to improve business management skills in a turbulent environment. Develop a project charter by explaining the elements that form part of a project charter. Thereafter, provide specific practical examples for each of these elements based on the business clinic project. As a project manager for Nando’s you must manage a project with activities and their respective durations as listed in the table below: Activity Immediate Predecessor Duration (months) A None 2 B A 4 C A 2 D B 2 E B, C 4 F A, E 6 G D 4 H D, E, F 2 I G, H 6 J H, F 6 K H, I, J 4 3.1 Construct a network diagram to analyses your project. NB: The network diagram needs to have all the values otherwise zero marks will be awarded Answer: 3.2 What is the total project duration time? (1) Answer: 3.3 Identify the critical path on your network diagram. (1) Answer: 3.4 When is the latest time that activity G must be completed in order not to experience any delays in the project? (1) Answer: 3.5 What is the earliest time that activity D can possibly be completed? (1) Answer: 3.6 What is the free float for activity E with respect to activity H? Show your calculations. (4) Answer: 3.7 What would the implication to the project duration time be if there was a delay of 2 months in completing activity F? (1) Answer: Please include a complete list of references here: Total: 60 Marks

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
27 september 2024
Aantal pagina's
11
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

RONSAM
TUTORS
PRM3701 ASSIGNMENT 06 DUE 01
OCTOBER 2024




DISCLAIMER!!!: The assignments sold through this website
are intended for research, study, and reference purposes
only. They are not to be submitted as your own work. Only
use this document as reference to generate your own
assignment


FOR EXAMS, PORTFOLIO, AND ASSIGNMENT ASSISTANCE
WHATSAPP 0671189059 EMAIL:


, QUESTION 1 [15 MARKS]


You have been invited to deliver a speech to young
graduates about important issues in project management.
To educate them properly answer the questions that
follow.
 Please note you will be required to do research on the
questions below.
 Also indicate your references

1.1. Discuss five constraints, besides a project budget, that
a project manager must balance to successfully
complete a project(5 marks).

1. Scope

Scope is one of the major regulatory factors that a project manager is
faced with in her work; it is understood as the defined goals, products,
and results that the project is set to accomplish. When not controlled or
veered into informally, scope creep the act of changing a project’s
objectives without authorization can impact other aspects of the project
if not controlled (Larson & Gray, 2018). That is why keeping the project
scope clear and avoiding project scope creep helps the project remain
on task and does not exhaust resources.


2. Time


Time concerns the project calendar, which is made up of due dates on
milestones, as well as the overall project duration. Time is highly sensitive as it
may result to costs wastage, unavailability of resources and finally, dissatisfaction
among the stakeholders (Larson & Gray, 2018). A project manager will need to
make certain that the project is on schedule, which is often done with automated
project scheduling tools, including Gantt charts and Critical Path Method (CPM).


3. Quality

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
VBPSEDUPROS SN Tutors
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
723
Lid sinds
2 jaar
Aantal volgers
473
Documenten
221
Laatst verkocht
1 week geleden
VBPS EDUPROS

Exams, assignment solutions and study notes

4,1

114 beoordelingen

5
69
4
13
3
16
2
4
1
12

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen