100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Case uitwerking

financial risk management

Beoordeling
-
Verkocht
-
Pagina's
3
Geüpload op
21-09-2024
Geschreven in
2024/2025

financial risk management

Instelling
Vak








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Studie
Onbekend
Vak

Documentinformatie

Geüpload op
21 september 2024
Aantal pagina's
3
Geschreven in
2024/2025
Type
Case uitwerking
Docent(en)
Onbekend
Cijfer
Onbekend

Onderwerpen

Voorbeeld van de inhoud

MANG 6020 Financial Risk Management
Seminar 5
Question 1
Explain the difference between value at risk and expected shortfall.
Solution:
Value at risk is the loss that is expected to be exceeded (100 – X)% of the time in N days for
specified parameter values, X and N . Expected shortfall is the expected loss conditional that
the loss is greater than the Value at Risk.


Question 2
Explain the historical simulation method for calculating VaR.
Solution:
The historical simulation method involves constructing N scenarios of what might happen
between today and tomorrow from N days of historical data. The first scenario assumes that the
percentage change in all market variables will be the same as that between the first day (Day 0)
and the second day (Day 1); the second scenario assumes that the percentage change in all
market variables will be the same as that between the second day (Day 1) and the third day (Day
2); and so on. The final scenario assumes that the percentage change in all market variables will
be the same as that between yesterday (Day N - 1) and today (Day N ). The portfolio is valued
for each scenario and VaR is calculated from the probability distribution of portfolio value -




changes. scenario pro , profit aim 376%
2×290×9*8 = O 412%
; ?m%%
aw%
.




°

4%xa% to
-




86×27×2 awk -
" gagaqif -
88.48 2

Question 3 0.367
.xr% 0.04% -2
coal
if
. 1

Suppose that each of two investments has a 4% chance of a loss of $10 million, a 2% chance of a
loss of $1 million, and a 94% chance of a profit of $1 million. They are independent of each
other.
(a) What is the VaR for one of the investments when the confidence level is 95%? A
(b) What is the expected shortfall (ES) when the confidence level is 95%?
(c) What is the VaR for a portfolio consisting of the two investments when the confidence level is
95%?
(d) What is the expected shortfall for a portfolio consisting of the two investments when the
confidence level is 95%?
(e) Show that, in this example, VaR does not satisfy the subadditivity condition whereas expected
shortfall does. cumulative PM → ⑨ vape ,
.




+
cat .




profit carillon, probe
o.GE#cb7ES=SoofXl0t2ofoX1
-
to

-
l
44% T
w,
= 8+0.2=8.2 LES)


goof
-
I
-11
€3,74
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
1097434525U

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
1097434525U hoacf
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
1 jaar
Aantal volgers
0
Documenten
31
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen