MGMT 480 CHAPTER 18 Exam Questions And Answers 100% Verified
MGMT 480 CHAPTER 18 Exam Questions And Answers 100% Verified 1. The county government has decided to redo the street you live on and plans to block the street off which causes you and your neighbor's considerable inconvenience. The project has three parallel paths defined as follows: (i) path A-B-C-H to install street lights and electrical wiring that takes 16 days, (ii) path A-D-E-H to install sidewalks with handicap capabilities that takes 22 days, and (iii) path A-F-G-H to repave the street including storm drains that takes 30 days. Which one of the following statements is true? a. The expected duration of the project is 30 + 22 + 16 = 68 days. b. Path A-B-C-H is the critical path. c. Path A-D-E-H has the most slack time. d. Path A-F-G-H is the critical path. - answerD A project has three paths. A-B-C has a length of 25 days. A-D-C has a length of 15 days. Finally, A-E-C has a length of 20 days. Which one of the following statements is true? a. A-D-C is the critical path. b. A-B-C has the most slack. c. The expected duration of this project is 25 days. d. The expected duration of this project is 25 + 15 + 20 = 60 days. - answerC Which of the following is not considered a project? a. Writing and implementing a computer program b. Introducing a new product c. Production of soft drinks d. Building a bridge - answerC
Geschreven voor
- Instelling
- MGMT 480
- Vak
- MGMT 480
Documentinformatie
- Geüpload op
- 15 april 2024
- Aantal pagina's
- 4
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
mgmt 480 chapter 18 exam questions and answers 100