LATEST Fdny g60 PRACTICE TEST With Complete solutions
Sprinkler system must NOT be shut off or impaired while hot work is performed - ans --Place damp cloth guards on individual sprinkler heads The person conducting the fire watch ______ have other duties - ans --CANNOT A portable fire extinguisher with a rating of _________ is required and should be within ____ feet travel distance hot work area - ans --2-A:20-B:C///30 For ROOFING OPERATIONS, a portable fire extinguisher with a minimum rating of ______ is required - ans --3-A:40-B:C Fire watch on floors below is ______ - ans --required The fire watch must continue for a minimum of ____ minutes after the hot work is done - ans --30 For any CNG or LPG torch operations, the first inspection shall be conducted ___ minutes after completion. The second inspection shall be conducted _______ after completion of torch operations. - ans --30 min///1 hour The fire guard or fire watch personnel must complete a signed inspection report and it must be submitted to and retained by the person in charge of the torch operations. - ans --The report must be made available and maintained on the premises for a minimum of 48 hours after the work is complete. Most common fuel gasses used in blowtorches are ______ - ans --LPG (butane, propane) natural gas (methane) (either CNG or piped natural gasses) Soldering and brazing temperatures are typically______ - ans --840 degrees F Oxy-acetylene generates the highest temperature which can reach up to _____ - ans --6000 degrees F
Geschreven voor
- Instelling
- FDNYC G60
- Vak
- FDNYC G60
Documentinformatie
- Geüpload op
- 1 april 2024
- Aantal pagina's
- 4
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
sprinkler system must not be shut off or impa
Ook beschikbaar in voordeelbundel