100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

INCOSE Chpt5 QUESTIONS WITH A GUARANTEED A+

Beoordeling
-
Verkocht
-
Pagina's
11
Cijfer
A+
Geüpload op
19-12-2023
Geschreven in
2023/2024

What are technical management processes used for? - -establish and evolve plans -execute plans -assess actual achievement and progress against plans -control execution thru to fulfillment What is the difference between a project manager's point of view and an SE's point of view? - PM sees project start to project end SE sees product ideas to product disposal What is created at the interaction of systems engineering and project management? - WBS Work Breakdown Structure What is a SEMP - Systems Engineering Master Plan top-level plan for managing the SE effort; how the project will be organized, structured and conducted and how it will be controlled to satisfy stakeholder requirements What is a SEMS? - Systems Engineering Master Schedule -essential part of SEMP -tool for project control -IDs the critical path of technical activities in the project What is the format of a SEMP? - tailored to fit project, customer or company standards Two key outputs from the project planning process are what? - -SEMP -WBSWhat is the purpose of Project Planning Process? - to produce and coordinate effective and workable plans What does project planning do? - establishes the direction and infrastructure necessary to enable the assessment and control of the project progress and identifies the details of the work and the reight set of personnel, skills and facilities What 4 artifacts are definitely included in a SEMP? - -Technical reviews -SEMS -WBS -TPM (Technical Performance measures) What are methods of verification? - inspection, analysis, demonstration and test What is the purpose of the project assessment and control Process? - -assess if the plans are aligned and feasible -determine the status of the project -technical and process performance -direct execution in accordance with plans, schedule, and budget When should assessments be scheduled? - -Periodically and for all milestones and decision gates What process may trigger other technical management processes? - project assessment and control What are 3 key "initiates" while controlling the project? - -Initiate preventative actions when assessments indicate a trend toward deviation -Initiate problem resolution when assessments indicate nonconformance with performance success criteria -Initiate corrective actions when assessments indicate deviation from approved plansWhat is the agile PM technique to project assessment and control? - -schedule frequent assessments -make project control adjustments on a tighter feedback cycle What is the purpose of the decision management process? - provide a structured, analytical framework for objectively identifying, characterizing and evaluating a set of alternatives for a decision at any point in the life cycle and select the most beneficial course of action

Meer zien Lees minder
Instelling
INCOSE Chpt5
Vak
INCOSE Chpt5









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
INCOSE Chpt5
Vak
INCOSE Chpt5

Documentinformatie

Geüpload op
19 december 2023
Aantal pagina's
11
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€7,49
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainarium Delaware State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1825
Lid sinds
2 jaar
Aantal volgers
1043
Documenten
22338
Laatst verkocht
4 dagen geleden

3,8

317 beoordelingen

5
147
4
60
3
54
2
16
1
40

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen