100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

LARE Section 1: Project & Construction Management

Beoordeling
-
Verkocht
-
Pagina's
43
Cijfer
A+
Geüpload op
17-12-2023
Geschreven in
2023/2024

LARE Section 1: Project & Construction Management Pre-Project Management - ANS ️️ (10%) The designer pursues a particular project for a client. Through discussions about the desired final product, a scope of services and deliverables are arrived at. The designer prepares a design proposal which if agreed to becomes a contract between the client and the designer. Thus the project begins. Project Management - ANS ️️ (30%) Relating to the LARE, project management begins with determining the project scope and assembling an appropriate design team, going through the design process while communicating progress with the client and completing "permittable documents that protect the health, safety and welfare of the public. These documents have been prepared so that the project can be constructed within an established budget Whether this is the case or not will be tested during the bidding process. Bidding - ANS ️️ (20%) Combining the design documents with other bid and contract documents, the project is then reviewed by prospective contractors who decide whether they wish to provide a bid. The designer plays a particular role in the bidding process, answering questions that arise during the bid process, assisting the owner in choosing a contractor by assessing the bids and possibly investigating bidder qualifications. Construction - ANS ️️ (30%) Like in bidding, the designer plays a particular role during construction. Usually not related to the physical execution of the design documents, but participating in meetings with the owner and contractor, providing clarifications to documentation questions, reviewing construction progress that the installation is proceeding as designed and providing substantial completion and punch list services once the contractor declares the completion of construction. Maintenance - ANS ️️ (10%) The designer's participation in the project may not end with construction. At times, the designer may be asked to prepare maintenance and operation manuals, prepare a management plan and review maintenance services. Components of Pre-Project Management (7) - ANS ️️ -Preparation of or response to a Request for Qualification (RFQ) or Request for Proposal (RFP) -Determine project scope and client requirements -Develop design program -Establish Scope of Services and required outside expertise (selecting a team of project consultants) -Establish project budget -Prepare and negotiate contractual agreements with the client -Establish project schedule Client - ANS ️️ A person usin

Meer zien Lees minder
Instelling
Lymphedema
Vak
Lymphedema











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Lymphedema
Vak
Lymphedema

Documentinformatie

Geüpload op
17 december 2023
Aantal pagina's
43
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€12,39
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
KatelynWhitman West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1100
Lid sinds
2 jaar
Aantal volgers
483
Documenten
34017
Laatst verkocht
3 dagen geleden
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3,6

239 beoordelingen

5
95
4
39
3
54
2
20
1
31

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen