Construction Management Final exam study guide rated A
Construction Management Final exam study guide rated A The following are the challenges facing the construction industry today, except decreasing demand in sustainability requirements the parameters define the overall extent of work to be included in a construction contract. scope of project a supplemental drawing to the plans and specifications that details fabrication method, materials, and models of a product or installation associated with the project. shop drawings it is a process of awarding a contract to subcontractors and issuing a purchase order for materials and equipment. buy out a request made by the owner to add or subtract features to the scope of the project resulting in changes to the contract change order a daily amount of money paid by the contractor to the owner for each day that the project fails to meet the completion date specified in the contract liquidated damage a change or addition to the contract documents issued after the documents have been released but before the bids are due addenda a contract document set consists of an agreement, construction drawings, specifications, addenda, general and supplementary condition the shop drawings are prepared by the architect in the traditional project delivery method for buildings, the day-to-day supervision of the construction is generally the responsibility of the general contractor what is the first known recorded building code that outlines the roles and duties of the master builder code of hammurabi in the construction management (CM) method of project delivery, there is normally no general contractor true in the construction management at risk (CMAR) method of project delivery, the construction manager manages the project's construction during the construction phase what project delivery method in which only one firm is contracted for both design and construction of the project design-build what delivery method is best used if highly technical in nature of the project that requires good communication and coordination need to occur between designers and builder? Design-build what delivery method in which there is no or limited input from contractors and subcontractors during the design phase? Design-Bid-Build Turnkey method is a variation of what delivery method when it also involves arranging for land and financing of the project? Design-Build what delivery method in which it is hard to get real up-front fixed price, or price may not be known until it is actually built? design-build what delivery method in which the owner assumes full responsibility on all liability risk during construction stage? CM the Master Format has been developed by the: Construction Specifications Institute The UNIFORMAT II has been developed by the: American Society for Testing and Materials the current master format consists of how many divisions 50
Geschreven voor
- Instelling
- Construction Management
- Vak
- Construction Management
Documentinformatie
- Geüpload op
- 2 oktober 2023
- Aantal pagina's
- 19
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
construction management final exam study guide rat
Ook beschikbaar in voordeelbundel