100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

DVA2601Assessment 2

Beoordeling
-
Verkocht
1
Pagina's
10
Cijfer
A
Geüpload op
09-09-2023
Geschreven in
2023/2024

Exam of 10 pages for the course dva2601 at dva2601 (DVA2601Assessment 2)

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
9 september 2023
Aantal pagina's
10
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

2.1 Explain how the Logical Framework Approach (LFA) can enhance project design, and
provide examples of its application in real-world development projects.

The Logical Framework Approach (LFA) is a systematic and structured planning and
management tool commonly used in project management, especially in the context of
development projects. LFA enhances project design by providing a framework for clear and
organized thinking, ensuring that projects are well-defined, logically structured, and aligned
with their intended outcomes. Here's how LFA can enhance project design and some real-
world examples of its application:

Enhancements LFA brings to project design: a. Clarity of Objectives: LFA helps in precisely
defining project objectives. It requires project planners to articulate what the project aims
to achieve in a clear and measurable manner, often referred to as the "project's logframe."
For example, in a healthcare project, the objective might be to reduce infant mortality rates
by a certain percentage within a specific timeframe.

b. Logical Structure: LFA encourages breaking down the project into logical components
such as inputs, activities, outputs, outcomes, and impacts. This step ensures that the
project's design is coherent and that each element contributes to achieving the overall
objectives.

c. Risk Analysis: It forces project planners to identify potential risks and assumptions that
might affect project success. For instance, in an agricultural development project, an
assumption might be that the weather conditions will be favorable for crop cultivation.

d. Monitoring and Evaluation: LFA incorporates indicators and means of verification (MOVs)
for each component of the project, facilitating ongoing monitoring and evaluation. This
helps project managers track progress and make necessary adjustments.

Examples of LFA in real-world development projects:

1. Education Project: An organization planning an education project may use LFA to
define clear objectives like increasing literacy rates in a particular region. They will
identify key activities such as teacher training and curriculum development, and they
will set indicators to measure progress, like the percentage of students who pass
standardized tests.

, 2. Infrastructure Development: In an infrastructure project like building a water supply
system, LFA can ensure that each phase of the project is aligned with the broader
objective of improving access to clean water. Indicators could include the number of
households connected to the new system.

3. Healthcare Intervention: LFA can be applied to a healthcare project aiming to reduce
the prevalence of a disease. Objectives could be measured in terms of decreased
disease incidence, with activities including vaccination campaigns and healthcare
outreach programs.




2.2 Explain the concept of the project environment and its significance in project planning
and implementation.

The concept of the project environment refers to the external factors and conditions that
can influence or impact a project's planning and implementation. Understanding the project
environment is crucial for project managers and stakeholders as it helps them anticipate
challenges, make informed decisions, and adapt to changing circumstances. Here's an
explanation of the concept and its significance:

Components of the Project Environment:

1. Stakeholders: This includes individuals, groups, or organizations that have an
interest in or are affected by the project. Understanding their needs, expectations,
and influence is essential for managing stakeholder relationships effectively.

2. Regulatory and Legal Framework: Projects often operate within a regulatory
framework that can include permits, licenses, and compliance requirements.
Violating these regulations can have legal consequences.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
smartacademy1 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
34
Lid sinds
2 jaar
Aantal volgers
29
Documenten
92
Laatst verkocht
1 jaar geleden

5,0

3 beoordelingen

5
3
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen