CTS | 280 Questions with 100 % Correct Answers | Verified
What are the four teams that comprise the overall Project Team? - Owner, Design, Installation, and Management Who would belong to the Design team? - Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? - Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - Owner Which group represent the generic roles that are important to the Project process? - Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - Programming, Building Design, AV Bid, and Move-In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? - System and infrastructure design and facility functionality may suffer
Geschreven voor
- Instelling
- CTS .
- Vak
- CTS .
Documentinformatie
- Geüpload op
- 20 juli 2023
- Aantal pagina's
- 26
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
cts
Ook beschikbaar in voordeelbundel