100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACQ 202 Module 4 Exam: Part 1 Questions, ( Answered) Graded A+

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
30-04-2023
Geschreven in
2022/2023

ACQ 202 Module 4 Exam: Part 1 Questions, ( Answered) Graded A+ Document Content and Description Below ACQ 202 Module 4 Exam: Part 1 Questions, ( Answered) Graded A+ A configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are con trolled and documented, interfaces are well-defined and understood, and _______________________________. - All product documentation is consistent with its supporting information. Which technical review is held during the Technology Maturation and Risk Reduction phase to ascertain progress in defining system technical requirements? - System Requirements Review (SRR) Program cost increases and schedules slips are most likely caused by __________________, changes to the design, and changes to the production processes. - Changes to user capability needs. What group is used to help control the configuration of external interfaces for a system? - Interface Control Working Group Your new-start program was approved this year's Authorization Bill and you are currently operating under Continuing Resolution Authority. To avoid losing a top engineering from your program, you authorial the Contractor to begin work since you expect the Appointment Bill to be signed next week. You are now in conflict with the _____. - Anti-Deficiency Act Cost, schedule, and performance parameters are interrelated and a change in one parameters can affect the others. Therefore it is important to involve all the key stakeholders when considering changes to Acquisition Program Baseline (APB). - True The Joint Interoperability Test Command (JITC) verifies ________________ through the field assessment of systems during exercises and contingencies, and provides certificates of _____________ upon validation. - Interoperability performance/ interoperability. Which of the following configuration baselines provides the details from which a contractor can transition from design to production of a system? - Product Baseline In the interest of independent reporting, Developmental Test and Evaluation (DT&E) and Operational Test and Evaluation (OT&E) activities may NOT be integrated. - False Changes are typical in acquisition programs; therefore, it is important to develop a sound configuration management strategy, place the Government in control of each element of the baselines, and design enough flexibility into the system to handle enhancements. - False. The _____________ includes details of processes, procedures, and materials used in fabrication and is usually controlled by the contractor. - Product Baseline. A new capability need has surfaced to modify an existing U.S. command and control system so that it can exchange information with a system operated by a European ally. Which of the following software best practices must be followed in order to successfully make this modification? - Define and control interfaces When using the cause-and-effect (Fishbone) diagram to resolve an acquisition problem, after you draw the fishbone diagram, the next step is to ____________________. - Define the problem Correct identification of the underlying root cause is the desired outcome of the ________________ approach to problem solving. - Cause-oriented The approved detail design resulting from the __________ serves as a basis for making the decision to begin production. - Critical Design Review The below-threshold maximum amount of Research, Development, Test, and Evaluation (RDT&E) funds that can be moved into a program element is _________. - $10 Million Using pre-production systems, and Operational Assessment can reduce program risk by - Providing operational effectiveness and suitability data. When a commercial item is procured by the Government, what will the contractor provide to the Government that documents the functional, performance, and physical characteristics of their product and will assist in the development of configuration management efforts? - Technical Data Package (TDP). A program deviation occurs if the PM thinks his/her program will not meet the threshold value established for a performance parameter in the Acquisition Program Baseline. - True A Government official who obligates the Government on a contract without having sufficient funds to cover that expense has violated the _______________. - Anti-Deficiency Act The Army can transfer excess funds from a Procurement appropriation to a Research, Development, Test, and Evaluation (RDT&E) appropriation to cover a funding shortfall of $3 million A configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are controlled and documented, interfaces are well-defined and understood, and _______________________________. - All product documentation is consistent with its supporting information. Which technical review is held during the Technology Maturation and Risk Reduction phase to ascertain progress in defining system technical requirements? - System Requirements Review (SRR) Program cost increases and schedules slips are most likely caused by __________________, changes to the design, and changes to the production processes. - Changes to user capability needs. What group is used to help control the configuration of external interfaces for a system? - Interface Control Working Group Your new-start program was approved this year's Authorization Bill and you are currently operating under Continuing Resolution Authority. To avoid losing a top engineering from your program, you authorial the Contractor to begin work since you expect the Appointment Bill to be signed next week. You are now in conflict with the _____. - Anti-Deficiency Act Cost, schedule, and performance parameters are interrelated and a change in one parameters can affect the others. Therefore it is important to involve all the key stakeholders when considering changes to Acquisition Program Baseline (APB). - True The Joint Interoperability Test Command (JITC) verifies ________________ through the field assessment of systems during exercises and contingencies, and provides certificates of _____________ upon validation. - Interoperability performance/ interoperability. Which of the following configuration baselines provides the details from which a contractor can transition from design to production of a system? - Product Baseline In the interest of independent reporting, Developmental Test and Evaluation (DT&E) and Operational Test and Evaluation (OT&E) activities may NOT be integrated. - False Changes are typical in acquisition programs; therefore, it is important to develop a sound configuration management strategy, place the Government in control of each element of the baselines, and design enough flexibility into the system to handle enhancements. - False. The _____________ includes details of processes, procedures, and materials used in fabrication and is usually controlled by the contractor. - Product Baseline. A new capability need has surfaced to modify an existing U.S. command and control system so that it can exchange information with a system operated by a European ally. Which of the following software best practices must be followed in order to successfully make this modification? - Define and control interfaces When using the cause-and-effect (Fishbone) diagram to resolve an acquisition problem, after you draw the fishbone diagram, the next step is to ____________________. - Define the problem Correct identification of the underlying root cause is the desired outcome of the ________________ approach to problem solving. - Cause-oriented The approved detail design resulting from the __________ serves as a basis for making the decision to begin production. - Critical Design Review The below-threshold maximum amount of Research, Development, Test, and Evaluation (RDT&E) funds that can be moved into a program element is _________. - $10 Million Using pre-production systems, and Operational Assessment can reduce program risk by - Providing operational effectiveness and suitability data. When a commercial item is procured by the Government, what will the contractor provide to the Government that documents the functional, performance, and physical characteristics of their product and will assist in the development of configuration management efforts? - Technical Data Package (TDP). A program deviation occurs if the PM thinks his/her program will not meet the threshold value established for a performance parameter in the Acquisition Program Baseline. - True A Government official who obligates the Government on a contract without having sufficient funds to cover that expense has violated the _______________. - Anti-Deficiency Act The Army can transfer excess funds from a Procurement appropriation to a Research, Developmen

Meer zien Lees minder
Instelling
ACQ 202
Vak
ACQ 202









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ACQ 202
Vak
ACQ 202

Documentinformatie

Geüpload op
30 april 2023
Aantal pagina's
8
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€8,84
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Savior NCSU
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
94
Lid sinds
2 jaar
Aantal volgers
70
Documenten
3432
Laatst verkocht
2 weken geleden

3,5

25 beoordelingen

5
9
4
7
3
3
2
0
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen