100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

PMI CAPM Free Dumps V9.02 Project Management Exam 2022

Beoordeling
-
Verkocht
-
Pagina's
44
Cijfer
A+
Geüpload op
09-04-2022
Geschreven in
2022/2023

PMI CAPM Free Dumps V9.02 Project Management Exam 2022

Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Study Level
Publisher
Subject
Course

Documentinformatie

Geüpload op
9 april 2022
Aantal pagina's
44
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

DUMPS
BASE
EXAM DUMPS

PMI
CAPM
28% OFF Automatically For You

Certified Associate in Project Management
(CAPM)?

,1.Which document defines how a project is executed, monitored and controlled, and
closed?
A. Strategic plan
B. Project charter
C. Project management plan
D. Service level agreement
Answer: C
Explanation:

2.2.3.1 Project Management Plan
The project management plan is the document that describes how the project will be
executed, monitored, and controlled. It integrates and consolidates all of the
subsidiary plans and baselines from the planning processes.
Project baselines include, but are not limited to:
- Scope baseline (Section 5.4.3.1),




e
as
- Schedule baseline (Section 6.6.3.1), and




B
- Cost baseline (Section 7.3.3.1).




ps
Subsidiary plans include, but are not limited to:

um
- Scope management plan (Section 5.1.3.1), |D
- Requirements management plan (Section 5.1.3.2),
02


- Schedule management plan (Section 6.1.3.1),
9.



- Cost management plan (Section 7.1.3.1),
V




- Quality management plan (Section 8.1.3.1),
ps
um




- Process improvement plan (Section 8.1.3.2),
- Human resource management plan (Section 9.1.3.1),
D
ee




- Communications management plan (Section 10.1.3.1),
Fr




- Risk management plan (Section 11.1.3.1),
M




- Procurement management plan (Section 12.1.3.1), and
P
A




- Stakeholder management plan (Section 13.2.3.1).
C




Among other things, the project management plan may also include the following:
I
M




- Life cycle selected for the project and the processes that will be applied to each
P




phase;
- Details of the tailoring decisions specified by the project management team as
follows:
○ Project management processes selected by the project management team,
○ Level of implementation for each selected process,
○ Descriptions of the tools and techniques to be used for accomplishing those
processes, and
○ Description of how the selected processes will be used to manage the specific
project, including the dependencies and interactions among those processes and the
essential inputs and outputs.
- Description of how work will be executed to accomplish the project objectives;
- Change management plan that documents how changes will be monitored and

,controlled;
- Configuration management plan that documents how Configuration management
will be performed;
- Description of how the integrity of the project baselines will be maintained;
- Requirements and techniques for communication among stakeholders; and
- Key management reviews for content, the extent of, and timing to address, open
issues and pending decisions.
The project management plan may be either summary level or detailed, and may be
composed of one or more subsidiary plans. Each of the subsidiary plans is detailed to
the extent required by the specific project. Once the project management plan is
baselined, it may only be changed when a change request is generated and approved
through the Perform Integrated Change Control process.


3.Which changes occur in risk and uncertainty as well as the cost of changes as the




e
as
life cycle of a typical project progresses?




B
A. Risk and uncertainty increase; the cost of changes increases.




ps
B. Risk and uncertainty increase; the cost of changes decreases.

um
C. Risk and uncertainty decrease; the cost of changes increases.
|D
D. Risk and uncertainty decrease; the cost of changes decreases.
02


Answer: C
9.
V
ps
um




4.Which tool or technique is used in the Plan Scope Management process?
A. Document analysis
D
ee




B. Observations
Fr




C. Product analysis
M




D. Expert judgment
P
A




Answer: D
C




Explanation:
I
M
P




5.1.2.1 Expert Judgment
Expert judgment refers to input received from knowledgeable and experienced
parties. Expertise may be provided by any group or person with specialized
education, knowledge, skill, experience, or training in developing scope management
plans.
Process: 5.1 Plan Scope ManagementDefinition: The process of creating a scope
management plan that documents how the project scope will be defined, validated,
and controlled. Key Benefit: The key benefit of this process is that it provides
guidance and direction on how scope will be managed throughout the project.
Inputs

6. Project management plan

, 7. Project charter

8. Enterprise environmental factors

9. Organizational process assets
Tools & Techniques

10. Expert judgment

11. Meetings
Outputs

12. Scope management plan




e
as
13. Requirements management plan




B
ps
um
14.Which tool or technique is an examination of industry and specific vendor
|D
capabilities?
02


A. Independent estimates
9.



B. Market research
V




C. Analytical techniques
ps
um




D. Bidder conferences
Answer: B
D
ee




Explanation:
Fr
M




15.1.2.3 Market Research
P
A




Market research includes examination of industry and specific vendor capabilities.
C




Procurement teams may leverage information gained at conferences, online reviews
I
M




and a variety of sources to identify market capabilities. The team may also refine
P




particular procurement objectives to leverage maturing technologies while balancing
risks associated with the breadth of vendors who can provide the materials or
services desired.


16.An input used in developing the communications management plan is:
A. Communication models.
B. Enterprise environmental factors.
C. Organizational communications.
D. Organizational cultures and styles.
Answer: B
Explanation:
€13,26
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
YNA Berkeley College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
76
Lid sinds
4 jaar
Aantal volgers
68
Documenten
616
Laatst verkocht
2 maanden geleden

3,7

9 beoordelingen

5
4
4
2
3
1
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen