100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Samenvatting

Summary Project IBA

Beoordeling
4,0
(1)
Verkocht
7
Pagina's
44
Geüpload op
15-03-2015
Geschreven in
2014/2015

Samenvatting hoofdstukken 1 tot en met 13!

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
15 maart 2015
Aantal pagina's
44
Geschreven in
2014/2015
Type
Samenvatting

Onderwerpen

Voorbeeld van de inhoud

Contents
Chapter 1: Introduction ........................................................................................................................... 2
Chapter 2: Organizational Context .......................................................................................................... 4
Chapter 3: Project Selection and Portfolio Management ....................................................................... 8
Chapter 4: Leadership and the Project Manager .................................................................................. 11
Chapter 5: Scope Management............................................................................................................. 13
Chapter 6: Project team Building, Conflict and Negotiation ................................................................. 18
Chapter 7: Risk Management ................................................................................................................ 21
Chapter 8: Cost Estimation and Budgeting ........................................................................................... 24
Chapter 9: Project Scheduling: Networks, Duration estimation and Critical path ................................ 26
Chapter 10: Project Scheduling: Lagging, Crashing, Activity Network .................................................. 33
Chapter 11: Critical Chain Project Scheduling ....................................................................................... 35
Chapter 12: Resource Management ..................................................................................................... 37
Chapter 13: Project Evaluation and Control.......................................................................................... 41




1

, Chapter 1: Introduction

Projects:
• Are undertaken to resolve a clear goal or set of goals.
• Are limited by budget, time, and resources.
• Are limited in scope.
• Are unique and temporary endeavors.
• Have a life-cycle, a defined start and end date.
• When project objectives have been delivered, the project will terminate.

Project Process
New process or product Repeat process or product
One objective Several objects
One shot, it has a limited life Ongoing
More heterogeneous People are homogenous
Systems must be created to integrate efforts Well-established systems to integrate efforts
Greater uncertainty of performance, cost, Greater certainty of performance, cost, schedule
schedule
Outside of line organization Part of line organization
Violates established practice Bastions (stronghold) of established practice
Upsets status quo Supports status quo

Five components of a project’s life cycle
- Client interest: level of enthusiasm
from customers.
- Project stake: the amount of corporate
investment in the project.
- Resources: the commitment of
financial, human and technical
resources.
- Creativity: the degree of innovation required by the project, especially in development phases.
- Uncertainty: the degree of risk associated with the project.




2

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
2 jaar geleden

4,0

1 beoordelingen

5
0
4
1
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
paulord Tilburg University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
55
Lid sinds
11 jaar
Aantal volgers
44
Documenten
12
Laatst verkocht
3 jaar geleden

3,6

10 beoordelingen

5
1
4
6
3
2
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen