MECHANICAL LAW CERTIFICATION SCRIPT 2026
QUESTIONS WITH SOLUTIONS GRADED A+
● What is the minimum age to become a member of the Board of Mechanical
Engineering?. Answer: 35
● What is the maximum plant capacity in which a CPM is allowed to operate, tend or
maintain?. Answer: 300 kW
● What does Section 22 of Republic Act No. 8495 cover?. Answer: Issuance of
Certificates of Registration and Professional License
● What law governs the practice of mechanical engineering in the Philippines?.
Answer: RA No. 8495
● Who is responsible for the preparation of plans and designs of a mechanical plant?.
Answer: PME
● What personnel is required for a mechanical plant with a capacity of 100 kW or over
but not more than 300 kW?. Answer: At least one CPM
● What is the PRC accredited national association for mechanical engineers?. Answer:
PSME
● When was the new Mechanical Engineering Law signed?. Answer: February 12, 1998
● When was House Bill No. 9806 passed by the House of Representatives?. Answer:
January 28, 1998
● When was Senate Bill No. 1793 passed by the Senate?. Answer: February 3, 1998
● What is the maximum number of shifts a mechanical work can operate every
twenty-four hours for 100 kW or over but not more than 300 kW?. Answer: One
● How many articles does the Mechanical Engineering Law have?. Answer: Five
● What are the contents of Article II of the Mechanical Engineering Law?. Answer: Board
of Mechanical Engineering
QUESTIONS WITH SOLUTIONS GRADED A+
● What is the minimum age to become a member of the Board of Mechanical
Engineering?. Answer: 35
● What is the maximum plant capacity in which a CPM is allowed to operate, tend or
maintain?. Answer: 300 kW
● What does Section 22 of Republic Act No. 8495 cover?. Answer: Issuance of
Certificates of Registration and Professional License
● What law governs the practice of mechanical engineering in the Philippines?.
Answer: RA No. 8495
● Who is responsible for the preparation of plans and designs of a mechanical plant?.
Answer: PME
● What personnel is required for a mechanical plant with a capacity of 100 kW or over
but not more than 300 kW?. Answer: At least one CPM
● What is the PRC accredited national association for mechanical engineers?. Answer:
PSME
● When was the new Mechanical Engineering Law signed?. Answer: February 12, 1998
● When was House Bill No. 9806 passed by the House of Representatives?. Answer:
January 28, 1998
● When was Senate Bill No. 1793 passed by the Senate?. Answer: February 3, 1998
● What is the maximum number of shifts a mechanical work can operate every
twenty-four hours for 100 kW or over but not more than 300 kW?. Answer: One
● How many articles does the Mechanical Engineering Law have?. Answer: Five
● What are the contents of Article II of the Mechanical Engineering Law?. Answer: Board
of Mechanical Engineering