Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 8 pagina's
Samenvatting

Summary Project Management - Chapters 1 to 4

Document preview thumbnail
Voorbeeld 2 van de 8 pagina's

With this clear summary of chapters 1 to 4 of Project Management (8th edition) you are one step closer to passing your exam!

Voorbeeld van de inhoud

SV Project Management

Chapter 1: practical theory
Improvised activities =
Not according to a laid down plan + usually when something unforeseen occurs that requires an
immediate response.
 Hard to predict the outcomes
 Flexible, but often chaotic (ad hoc)

Routine activities =
Activities that are repeated frequently and are relatively predictable. Work will be carried out
according to patterns
 Production line activities, sales procedures

Project-based activities =
Between improvised and routine activities. Have a limited duration and are predictable.
 Work divided in phases
 First project plan
 Information technology

Project =
A group of people, usually from various fields of expertise, collaborating temporarily with the aim of
reaching a predetermined project result within a predetermined budget and timeframe.
 Constructing projects (building bridge/factory)
 Developing new product
 Introducing learning environment at schools
 Organizing a festival

Project features
 Temporary (clear starting point, finishing date)
 Unique and clearly defined goal
 Has a clearly defined result
 Project sponsor (paying the project)
 Project organization (project manager & team)
 Project members different expertise
 What is the result

Type of projects
1. Technical projects (or hard projects)
- Change in technology or develop new product
 Construction of a building, a road

2. Social projects (or soft projects)
- Change organizational structure or culture of company (how people work together)
 Reorganization

3. Commercial projects
- Goal is to earn money
 Conducting market research, new product

4. Mixed projects
- Both technical and social projects

, - Difficult because team has wide variety expertise
 Design, programming and installation of a computer program

Top project failure reasons
1. Poor planning
2. Too optimistic planning
3. Failure to track progress
4. Starting an activity too late
5. Project members are not competent enough
6. Little delays all add up

Phases of a small project:
1. Preparation (think)
2. Realization (act)
3. Follow-up (maintain)

Phases of a large project:
1. Concept  the idea, project proposal
2. Definition  define result, project plan
3. Design  decide result, design report
4. Preparation  detailing how, building plan
5. Realization  doing it, project result
6. Follow-up  provide follow-up, resolving problems
 In phases because then the client can adjust in the project

Project should be SMART
 Specific: project result described in detail
 Measurable: result must be measurable
 Acceptable: group/person must be responsible for achieving the result
 Realistic: result must be realistic
 Time-bound: deadline

Chapter 2: people working on projects
Marshmallow challenge:
- Teams of 4
- Forces people to collaborate quickly
- Normally first orienting (talk)
- Planning
- Building
- Ta-da
 The ‘Ta-da’ is a ‘oh-oh’: fail

None of the kids spend any time to talk.
- Business students are trained to find the plan
- When it happens, they run out of time.

They manage the process
- Any team who does that, improve the team performance

Why conduct the marshmallow challenge:
- It helps the hidden assumptions
- The challenge is the shared experience

Gekoppeld boek
 image
Uitgever: Onbekend ISBN: 9789001891589 Druk: 8

Documentinformatie

Studie
Heel boek samengevat?
Nee
Wat is er van het boek samengevat?
Hoofdstuk 1 t/m 4
Geüpload op
30 maart 2021
Aantal pagina's
8
Geschreven in
2020/2021
Type
Samenvatting
€8,49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
linastudeert
3,9
(24)
Verkocht
137
Volgers
112
Items
1
Laatst verkocht
9 maanden geleden

Reviews van geverifieerde kopers



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen