D - ANSWERSWhich of the following is not a definition of a power plant? a) Any one or more boilers in which steam or other vapour is generated at more than 103 kPa (15 psi). b) Any one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). c) Any one or more boilers containing liquid and having a working temperature exceeding 121 degrees Celsius (250 degrees Fahrenheit). d) Any one or more boilers in which steam or other vapour is generated at less than 57 kPa (8 psi). e) Any engine run from one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). D - ANSWERSEarly government involvement in certification of power engineers became more important for the following reasons except: a) efficiency b) labour mobility c) safety d) pollution e) technological advancements C - ANSWERSWhich of the following is not characteristic of increased automation in power plants? a) computerised control stations b) increased mechanisation c) manual flame checking d) continuous monitoring of processes

Meer zien Lees minder
Instelling
Introduction To Power Engineering
Vak
Introduction to Power Engineering









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Introduction to Power Engineering
Vak
Introduction to Power Engineering

Documentinformatie

Geüpload op
14 januari 2026
Aantal pagina's
6
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

INTRODUCTION TO POWER
ENGINEERING EXAM QUESTIONS
WITH COMPLETE SOLUTIONS 2026
D - ANSWERSWhich of the following is not a definition of a power plant?
a) Any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
b) Any one or more boilers containing liquid and having a
working pressure exceeding 1100 kPa (160 psi).
c) Any one or more boilers containing liquid and having a working temperature
exceeding 121 degrees Celsius (250 degrees Fahrenheit).
d) Any one or more boilers in which steam or other vapour is generated at less than 57
kPa (8 psi).
e) Any engine run from one or more boilers containing liquid and having a working
pressure exceeding 1100 kPa (160 psi).

D - ANSWERSEarly government involvement in certification of power engineers
became more important for the following reasons
except:
a) efficiency
b) labour mobility
c) safety
d) pollution
e) technological advancements

C - ANSWERSWhich of the following is not characteristic of increased
automation in power plants?

a) computerised control stations
b) increased mechanisation
c) manual flame checking
d) continuous monitoring of processes
e) continuous monitoring of costs

A - ANSWERS"power plant" means

a) any one or more boilers in which steam or other vapour is generated at more than
103 kPa (15 psi).
b) any one or more boilers in which steam or other liquid is generated at more than 103
kPa (15 psi).
c) any one or more boilers, containing liquid and having a working pressure exceeding
1,200 kPa (160 psi), and a temperature exceeding 121 degrees C (250 degrees F ).

, d) any one or more boilers containing liquid and having a working pressure exceeding
1,200 kPa (160 psi), and a temperature not exceeding 121 degrees C (250 degrees F).
e) any one or more boilers containing liquid and having a working pressure not
exceeding 1,100 kPa (160 psi), and a temperature exceeding 121 degrees C (250
degrees F).

C - ANSWERSPower engineers are

a) safety code officers in a power plant automatically.
b) qualified to perform any welding jobs in a power plant.
c) skilled workers who operate and maintain the equipment in a power plant.
d) qualified to perform any electrical jobs in a power plant.
e) qualified to make



B - ANSWERSWhich of the following is not a common work schedule for power
engineers?

a) Year round employment
b) Seasonal lay-offs
c) Eight hour days
d) Twelve hour days
e) Rotating day and night shifts

A - ANSWERSWhen oil mixes with water in the boiler the resultant effect is:

a) serious foaming
b) accumulation of very hard scale resulting in tube burnout
c) accumulation of soot
d) decrease in water level
e) shifting and loosening of baffles
D - ANSWERSIn the early days, owners of power plants hired __________ workers,
who started out doing manual labour and through acquired experience they were
promoted to jobs with gradually increasing levels of skill.

a) qualified
b) highly educated
c) trained
d) unskilled
e) college trained

B - ANSWERSIn order to produce greater efficiency, higher boiler pressures were used
and this led to __________ due to employing of unqualified operators in a power plant.

a) economic gains
€17,30
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
papersmaster01 Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
283
Lid sinds
2 jaar
Aantal volgers
106
Documenten
14143
Laatst verkocht
4 dagen geleden
PAPERSMASTER01

On this page you will find documents , package deals, flashcards offered by seller PAPERSMASTER01.With our documents on your side you"ll be well equipped to tackle you exams and achieve the grades you need.

3,9

71 beoordelingen

5
22
4
33
3
9
2
3
1
4

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen