100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Samenvatting

Short summary MAC

Beoordeling
-
Verkocht
-
Pagina's
8
Geüpload op
11-03-2021
Geschreven in
2020/2021

Korte samenvatting MAC

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
11 maart 2021
Aantal pagina's
8
Geschreven in
2020/2021
Type
Samenvatting

Onderwerpen

Voorbeeld van de inhoud

Tekst blad

Decision management: Refers to those aspects of the decision process in which the manager either
initiates or implements a decision.
Decision control: Refers to aspects of the decision process whereby managers either ratify or
monitor decisions.

Cost driver input measure = quantity produced
Direct labor hours
Number of different order produced

Agency problems:
- Free-rider problem
o Agents have incentives to shirk because individual efforts are not directly observable
- Horizon problem
o Agents expect to leave firm in near future place less weight on l-t consequences
- Employee theft
o Employees take/steal firm resources for unauthorized purposes
- Empire-building
o Managers seek to manage larger number of agents to increase their own job or
compensation. If this goes against the profit maximization, this is a problem

Agency asymmetry problems:
- Adverse selection
o Prior to contracting, agents have better private information than principals
- Moral hazard
o After contracting, agents have an incentive to deviate because the principal cannot
readily observe deviations (hidden action or hidden information).

Cost centers  tries to minimize the costs of a subunit
Profit centers  tries to maximize the profit of a subunit. Managers responsible for input, output, pricing
Investment centers (potential performance measures: ROI, RI, EVA)  not just looking at costs and
profit, but also at what kind of investments they should make in order to maximize profit in the
future.

Paper Sikka & Willmott
Transfer pricing defined: the internal price (or cost allocation) charged by one segment of a firm for a
product or service supplied to another segment of the same firm. Ideal transfer price = opp. costs
Opportunity cost = benefits forgone by choosing one alternative from the opportunity set rather than the best non-selected alternative.


- If a firm has excess capacity, opportunity cost is identical to the variable production cost
- If a firm does not have excess capacity, opportunity cost is identical to the revenue available
if the product is sold outside

Methods to determine transfer price:
1. Market price method  transfer price based on external market prices. Objective, but does
not take transaction cost into account
2. Variable production cost method  marginal variable cost represent the value of resources
forgone. Doesn’t cover fixed costs. Incentive: selling department will convert fixed into
variable costs and reaches his limit of production capacity.

, 3. Full cost production method  includes both direct labor/ materials and overhead.
Overstate opportunity costs. Selling division can export inefficiencies to buying division (all
costs are included). Buying division will purchase to few units. Adv: avoids disputes of vari/fix costs
4. Negotiated pricing method  result in transfer price that approximate opportunity costs
because supply department won’t agree to price below its opp. cost and buying department
won’t pay price that is above production price elsewhere. Time consuming + depends on
power of departments. Adv: both departments have incentive to transfer number of units
that maximize their combined profits.

Disputes over transfer pricing occur frequently because transfer prices influence performance
evaluation of managers and hence there compensation or bonuses.
To reduce disputes, firms may reorganize by:
- Combining interdependent departments
- Converting supplier into a cost center instead of a profit center
- Converting profit centers into cost centers - - > Also you can decide to convert both supplier
and buying departments into cost centers. Give the pricing and quantity decisions in his own
hands. This may only be useful if the department do not have specific knowledge about some
products or service that is difficult to transfer across the firm

Segment in higher tax country: reduce taxable income in that country by charging high prices on
imports and low prices on exports
Segments in lower tax country: increase taxable income in that country by charging low prices on
imports and high prices on exports

Favourable (F) variance if:
- Actual revenue > budgeted revenue OR
- Actual expense < budgeted expense
Unfavourable (U) variance if:
- Actual revenue < budgeted revenue OR
- Actual expense > budgeted expense

In the static budget we do not adjust for the changes in volume but in the flexible budget we do.
Several budget options:
- Top-down budgets (dc)  top management can make aggregate forecasts, disaggregate down to lower levels.
- Bottom-up budgets (dm)  lower levels have more knowledge and make budget forecast
- Budget ratcheting  basing next year’s standard of performance on this year’s actual performance.
Creates dysfunctional behaviour: employees reduce output to avoid being held to higher standard in future
- Incremental budgets  begin with current year’s base budget and make incremental changes
- Zero-based budgeting  each line item must be justified each year, reset to zero. Motivates
managers to eliminate inefficient expenses.
- Line-item budgets  authorize managers to spend only up to the specified amount on each line item
- Rolling budgets  don’t have year to year, but continuously move the 18 months together.
Used to avoid thinking in short-term
- Budget lapsing  funds allocated for a year can’t be carried over to the following year.
Creates incentive to spend all their budget, because unspent must be returned to authority
that issued the money

Focussing on Performance Evaluation System - - >
Anthony:
- Strategic planning  deciding on the goals of the organisation and on the strategies
- Management control  goals and strategy are accepted, but now implement the strategies. Does not involve day-to-
day operating decisions.
o The process by which managers assure that resources are obtained and used effectively in the
accomplishment of the organizations objective. Influenced by principles of economic/ social psychology
- Operational control  processes used in carrying out day-today activities of organisation, ensuring that specific tasks
are carried out effectively.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
IRadboud Radboud Universiteit Nijmegen
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
135
Lid sinds
7 jaar
Aantal volgers
100
Documenten
44
Laatst verkocht
8 maanden geleden

3,5

22 beoordelingen

5
6
4
9
3
2
2
0
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen