Guides d'étude, Notes de cours & Résumés

Vous recherchez les meilleurs guides d'étude, notes d'étude et résumés sur  ? Sur cette page, vous trouverez 197 documents pour vous aider à réviser pour .

All 197 résultats

Trier par

CLC-222 Contracting Exam Questions And Answers
  • CLC-222 Contracting Exam Questions And Answers

  • Examen • 8 pages • 2024
  • CLC-222 Contracting Exam Questions And Answers What is a Contracting Officer Representative? - ANSWER- A technical representative that is appointed by the contracting officer through a designation letter The procuring Contracting Officer, Administrative Contracting Officer, Termination Contracting Officer, and the Contracting Officer's Representative are key players in the acquisition process. From the following statements, choose the correct answer: - ANSWER- The contracting officer a...
    (0)
  • 9,11 €
  • + en savoir plus
 CLC 222 Module 1 Exam COR Roles & Responsibilities Questions and Answers (2022) (Verified Answers)
  • CLC 222 Module 1 Exam COR Roles & Responsibilities Questions and Answers (2022) (Verified Answers)

  • Examen • 2 pages • 2024
  • CLC 222 Module 1 Exam COR Roles & Responsibilities Questions and Answers (2022) (Verified Answers) CLC 222 Module 0-1 Exam: COR Roles & Responsibilities • What is the source of the COR's authority? o Correct: The Contracting Officer’s Representative Designation/Appointment Letter • Of the following lists, which one is NOT an accurate list of the documents required to be maintained in a COR file? o Correct: Copies of the contract and modifications, PWS, government property invent...
    (0)
  • 7,67 €
  • + en savoir plus
 CLC 222 Module 6 Exam Special Considerations Questions and Answers (2022) (Verified Answers
  • CLC 222 Module 6 Exam Special Considerations Questions and Answers (2022) (Verified Answers

  • Examen • 2 pages • 2024
  • CLC 222 Module 6 Exam Special Considerations Questions and Answers (2022) (Verified Answers) CLC 222 Module 6 Exam: Special Considerations • A Quality Assurance Surveillance Plan (QASP) is ? o Correct: The government?s plan to monitor the contractor?s quality assurance, it includes the methods, frequencies and types of surveillance that will be conducted. • The Quality Assurance Surveillance Plan (QASP) provides the government inspection plan to ensure contractor quality. o Correct:...
    (0)
  • 7,95 €
  • + en savoir plus
Cbt 222 Prep Exam And Answers Solved 100% 2024.
  • Cbt 222 Prep Exam And Answers Solved 100% 2024.

  • Examen • 11 pages • 2024
  • You are the COR are at the government training installation during a Session there is a... To discontinue work until after class you should request of the contractor take a break - Answer False What ethical issue may be encountered bye see you ours during the performance of their duty - Answer All of these answers are correct Of the following list which one is not an accurate list of the documents required to be maintained in a COR file - Answer Copies of the contract and modificatio...
    (0)
  • 7,28 €
  • + en savoir plus
Clc  222 Exam 1 Questions With Complete Solutions  Rated A + 2024.
  • Clc 222 Exam 1 Questions With Complete Solutions Rated A + 2024.

  • Examen • 6 pages • 2024
  • Notice to Proceed - Answer Authorizes that project is beginning and contractor can take over site and begin spending money. This establishes the reference date 4 M's of Construction - Answer Money, Materials, Manpower, Machines Letter of Intent - Answer may be issued to a contractor by owner before contract documents are available and cannot be enforced, states intention of the project Conceptual Drawings - Answer Including but not limited to architectural renderings, 3D layout...
    (0)
  • 7,28 €
  • + en savoir plus
CLC 206- COR in Contingency Environment Test Questions And Actual Answers 2024.
  • CLC 206- COR in Contingency Environment Test Questions And Actual Answers 2024.

  • Examen • 2 pages • 2024
  • In a contingency environment there is less need to worry about information security, since everyone in the camp has been vetted through security channels. - Answer False There are numerous statutory and regulatory prohibitions on the conduct of procurement personnel acting in an official capacity. From the following, select the correct statement: - Answer Participation by a government employee in mattes in which he or she has a financial interest is a major... Which conversational tabo...
    (0)
  • 7,28 €
  • + en savoir plus
CLC 222 Comprehensive Exam Questions With Actual Answers  100 % 2024.
  • CLC 222 Comprehensive Exam Questions With Actual Answers 100 % 2024.

  • Examen • 2 pages • 2024
  • Truth in Negotiations Act (TINA) - Answer Occurs when the contractor gives false cost and pricing data during negotiations subject. Defective pricing means the contractor certified to false data. Currently, the TINA threshold is $750,000. The possibility of defective pricing must be analyzed and substantiated before the KO takes action. What are Fixed Price Contracts? - Answer Fixed price contracts provide for a price that is not subject to any adjustment on the basis of the contractor...
    (0)
  • 7,28 €
  • + en savoir plus
CLC 222 CORs Lesson 1 Practice Exam With All Correct Solutions 100% 2024.
  • CLC 222 CORs Lesson 1 Practice Exam With All Correct Solutions 100% 2024.

  • Examen • 11 pages • 2024
  • What is COR? - Answer is designated in writing by the Contracting Officer (KO) to provide technical direction, clarification, and guidance with respect to the contract specifications and statement of work. , review and/ or approving contractor invoices, other contract surveillance and monitoring duties What is COR? - Answer The COR is the technical liaison between the contractor and the KO and is responsible for monitoring contractor performance and delivery as set forth in the contract. ...
    (0)
  • 7,28 €
  • + en savoir plus
CLC 222 Module 3 Assessement Questions And Answers Graded A+ 2024.
  • CLC 222 Module 3 Assessement Questions And Answers Graded A+ 2024.

  • Examen • 2 pages • 2024
  • The Contracting Officer's Representative needs to be careful when giving technical direction to the contractor that they do not provide Improper Technical Direction which include which of the following? - Answer Failing to take action in the face of late or poor performance. The main purpose for the COR to understand the contract and how it is organized is to be aware of all contractual requirements and deliverables. This knowledge helps the COR track contractor performance and ensure cont...
    (0)
  • 7,28 €
  • + en savoir plus
CLC 222 Module 5 Midterm Exam With Correct Answers A+ 2024.
  • CLC 222 Module 5 Midterm Exam With Correct Answers A+ 2024.

  • Examen • 1 pages • 2024
  • In remedy situations, the Contracting Officer's Representative's oversight duties and documented files are key to determining the course of action for the government to take. The COR contributes by: - Answer All of the answers are correct (Documenting, Communicating, Monitoring) If a contractor is delinquent on a portion of a contract, and that portion is clearly severable from the continuing portion of the contract, the Contracting Officer may terminate the deficient portion of the contr...
    (0)
  • 7,67 €
  • + en savoir plus