Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

BCN 3740 LEGAL FINAL STUDY GUIDE SET EXAM 2025/2026 QUESTIONS AND ANSWERS 100% PASS

Note
-
Vendu
-
Pages
8
Qualité
A+
Publié le
01-12-2025
Écrit en
2025/2026

BCN 3740 LEGAL FINAL STUDY GUIDE SET EXAM 2025/2026 QUESTIONS AND ANSWERS 100% PASS

Établissement
BCN 3740
Cours
BCN 3740









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
BCN 3740
Cours
BCN 3740

Infos sur le Document

Publié le
1 décembre 2025
Nombre de pages
8
Écrit en
2025/2026
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

BCN 3740 LEGAL FINAL STUDY GUIDE
SET EXAM 2025/2026 QUESTIONS AND
ANSWERS 100% PASS




The Betterment Defense in a contract action would - ANS Be alleged by the contractor and
claim that the owner is seeking completion costs from the work performed by the replacement
contractor which work exceeded the quality, scope and/or amount originally contracted for by
the owner with the original contractor



Work on a public project pursuant to Florida Statue 255.05, requires a bond be posted by -
ANS the contractor if the contract work is in excess of $200,000



The total Cost Method of Damages calculates damages by - ANS taking the total cost of the
work loss the original bid amount by the contractor to come up with a damages number



Once a complaint has been served upon - ANS File a response to the complaint within 20
days of being served



The amount of the bond on a public project must equal - ANS The contract price between the
owner and contractor



The preferred method of litigation for a contractor is through - ANS it depends on the
circumstances

1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

, If your contract has an enforceable arbitration clause the parties to that contract must arbitrate
unless - ANS Both parties to the contract act inconsistent with the arbitration clause in their
contract



Categories of extras to a construction contract for which a contractor may claim additional
monies may include - ANS Improper site conditions/ work changes as a result of code
requirements



A contractor working on a government project - ANS None of the above



A general contractor who reviews plans and specifications for a construction project has a duty
to tell the owner and/or architect and/or engineer about defects in the plans and specifications
only if those defects - ANS Patent Defects



A cardinal change to a contract is - ANS -a change so significant that it changes the entire
scope of the contract

-a change so significant that the contract is abandoned and the measure of damages is the
reasonable value of the work performed



The most widely accepted method of calculating unabsorbed home office overhead is by using -
ANS The Eichleay Formula



Where the Owner is clearly justified in defaulting the contractor, the surety can exercise which
option - ANS All of the above (rehire the contract the owner terminated to finish project,
rebid and relect the project to a completion contractor, pay the owner an agreed upon amount
and buy back the bond)




2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
11,49 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Fyndlay Kaplan University
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
357
Membre depuis
1 année
Nombre de followers
80
Documents
18668
Dernière vente
3 jours de cela
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3,7

68 revues

5
32
4
8
3
13
2
6
1
9

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions