FPM Joyce Mulders PEW 2

FPM oefentoets

These are the abridged financial statements for an organization:




Additionally, the following information is available:
• Interest payments charged to the P&L account in 2019 are € 400,000.
• The net profit for 2019 is broken down as follows:
o Corporate tax: € 200,000
o Dividend: € 200,000
o Retained earnings: € 600,000
• Corporate tax and dividend are treated as liabilities.
• Retained earnings are treated as shareholder's equity.

This organization's ROA (return on assets) is:



a. 18.60%
b. 12.73%
c. 11.67%
d. 14.00%

EBIT = Earnings Before Interest and Tax
EBIT = 400.000 + 200.000 + 200.000 + 600.000 = 1.400.000
(Average) Total Assets = (10.000.000 + 12.000.000) / 2 = 11.000.000
ROA = 1.400..000.000 x 100% = 12.73%

This is the balance sheet of an organization:




1

,FPM Joyce Mulders PEW 2

What is the debt ratio of this organization?




a. 0.41
b. 0.65
c. 0.35
d. 0.54

Want: 35/100 = 0.35

A business analyst has the following information for two projects:




Based on the net present value (NPV) of both projects, which of the following statements
is correct? Please note that the WACC is 8%




a. Only project B warrants further consideration
b. Only project A warrants further consideration
c. Both projects warrant further consideration, but project B should be preferred over
project A.
d. Both projects warrant further consideration, but project A should be preferred
over project B.

NPV project A = 500.000 + 150.000/1.08 + 200.000/1.08^2 + 400.000/1.08^3 = 1.399.164,80
NPV project B = 300.000 + 100.000/1.08 + 100.000/1.08^2 + 100.000/1.08^3 +
200.000/1.08^4 = 922.708,99

If NPV > 0 -> project warrants further consideration! - verdient overweging (hoe hoger hoe beter)




2

,FPM Joyce Mulders PEW 2

How can you characterize this project today?




a. Under budget and ahead of schedule
b. Under budget and behind schedule
c. Over budget and behind schedule
d. Over budget and ahead of schedule
-> Want actual costs zijn lager dan planned costs
-> Want earned value is groter dan planned value

Consider the following data for a specific project:




What is the shortest possible duration of this project if you ignore the resources?
a. 9 days
b. 11 days
c. 10 days
d. 12 days




3

, FPM Joyce Mulders PEW 2

-> Tekenen!!! Dan kom je er achter dat je C kan doen tijdens de andere werkzaamheden en
dat het snelste pad 10 dagen is.

Consider the table above. What would be the implication on the project if Mary starts
working a day later?
a. The project will not be delayed
b. The project will be delayed for 2 days
c. The project will be delayed for 3 days
d. The project will be delayed for 1 day

Look at the activities of the project below.




What is the critical path of the project?
a. ABCDEFGHI
b. ABEGI
c. ACFHI
d. ABDGI

Look at the activities of the project above. Which activities of this project have slack?
a. BEG
b. BDG
c. BDEG
d. CFH
-> Dit zijn alle letters die geen deel uitmaken van het critical path

Which of the examples below CANNOT be characterized as a project?
a. Preparing a new personal loan package at ABN AMRO
b. Restructuring the company’s interest page due to legislative changes
c. Producing bikes
d. Building a bridge across river Lek

Read the following statements:
I) Project-based organizations are well-suited for achieving economies of scale.
II) A project can be defined as a planned temporary endeavor undertaken to create a unique
product or service or other complete and definite outcome (deliverable), within a limited time
scale and budget.
a. Both statements are correct
b. Only statement 2 is correct
c. Only statement 1 is correct


4

École, étude et sujet

Établissement
Cours
Cours

Infos sur le Document

Publié le
23 janvier 2021
Nombre de pages
131
Écrit en
2019/2020
Type
Notes de cours
Professeur(s)
.
Contenu
Toutes les classes

Sujets

5,59 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
Lire en ligne ou en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
joycemulders Tilburg University
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
38
Membre depuis
6 année
Nombre de followers
32
Documents
14
Dernière vente
2 année de cela

4,5

2 revues

5
1
4
1
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions