Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

PRO4801 Assignment 2 Memo | Due May 2025

Note
-
Vendu
-
Pages
14
Qualité
A+
Publié le
30-04-2025
Écrit en
2024/2025

PRO4801 Assignment 2 Memo | Due May 2025. All questions fully answered. Question 2.1 Projects go through many uncertainties. Therefore, projects must be able to adjust. Traditional organisations are ineffective in the face of rapid change. In contrast, project organisations should be organic. (i) Explain what " organic" means. (10) (ii) Distinguish how the several kinds of integrators can enhance interaction, coordination, and mutual adjustments. (15) [25] Question 2.2 The South African Satellite (SAS) project for installing two very advanced satellite systems has been assigned to the Board. Explain the (i) Specific content, typical activities, and (16) (ii) Different management approaches of the Board, (9) (referring to each of the four phases in the SAS systems development cycle). [(i) 4 marks each phase; (ii) 9 marks] [25] Question 2.3 Project managers must be able to adapt and understand structural patterns and specific roles that enhance project performance. (i) Defend the selection of a project structure (form of organisation) by referring to the importance of organisational structure for projects. (20) (ii) Differentiate between the formal and informal organisational structures, and explain the informal organisation’s role in project management. (5) [25] Question 2.4 Project managers are responsible for making decisions and performing various other duties. Yet, their authority is often limited, and they must seek other power sources. This requires a new set of skills and the capacity to assemble mechanisms that complement performance. (i) Illustrate the different focal points of a project manager’s role. Explain the effect of a project manager’s “umbrella” responsibility in projects. (15) (ii) Distinguish between and explain the different categories of qualifications for a successful project manager. (10) [25] [Total marks: 100] (Weight: 10%)

Montrer plus Lire moins
Établissement
Cours









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Livre connecté

École, étude et sujet

Établissement
Cours

Infos sur le Document

Publié le
30 avril 2025
Nombre de pages
14
Écrit en
2024/2025
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

, PLEASE USE THIS DOCUMENT AS A GUIDE TO ANSWER YOUR ASSIGNMENT

 Question 2.1

1. Projects go through many uncertainties. Therefore, projects must be able to adjust.
Traditional organisations are ineffective in the face of rapid change. In contrast, project
organisations should be organic.
(i) Explain what " organic" means.
(ii) Distinguish how the several kinds of integrators can enhance interaction, coordination, and
mutual adjustments.

Understanding Organic Project Organizations
Projects are inherently dynamic, uncertain, and unique in nature. As such, the organizations that
manage them must be structured in a way that allows for flexibility, adaptability, and responsiveness.
Traditional organizational structures, which are often rigid and hierarchical, struggle to
accommodate the rapid changes that characterize project environments. In contrast, project
organizations must be "organic" to effectively manage the challenges and complexities inherent in
project work (PRO4801, Study Guide, 2025).

Defining "Organic" in the Project Management Context
The term "organic" in project management refers to the structural and functional adaptability of
project organizations. An organic organization is one that is fluid, flexible, and capable of adjusting
to the changing demands and uncertainties of its environment. This concept stands in contrast to
mechanistic organizations, which rely heavily on formalized procedures, strict hierarchies, and
centralized control. According to the PRO4801 Study Guide (2025), for a project organization to be
considered organic, it must demonstrate two key characteristics: horizontal integration and structural
differentiation.

Horizontal Integration: This involves the use of direct communication and collaboration across
different functional units, bypassing traditional hierarchical chains of command. Organic project
organizations facilitate cross-functional interaction by creating channels that cut across formal lines
of authority. This horizontal approach enhances responsiveness by ensuring that information flows
freely between the units that need it, enabling rapid decision-making and mutual problem-solving
(PRO4801, Study Guide, 2025).

Structural Differentiation: Organic structures are also characterized by their ability to tailor
subunits to the specific requirements of a given project and its context. This means that rather than
applying a one-size-fits-all structure, the organization adapts its internal configuration to the unique
needs of each project. Differentiation supports specialization while allowing for the integration
necessary to coordinate the work of diverse project teams (PRO4801, Study Guide, 2025).

The organic nature of projects is closely tied to their defining attributes: temporariness, uniqueness,
and uncertainty. Projects are non-repetitive, dynamic undertakings that evolve as they progress. They
often involve ambiguous goals, fluctuating resource availability, and unpredictable external
influences. Therefore, project organizations must embrace an organic structure to remain effective in
such fluid environments.
2,93 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Aimark94 University of South Africa (Unisa)
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
6579
Membre depuis
6 année
Nombre de followers
3168
Documents
1329
Dernière vente
4 jours de cela
Simple & Affordable Study Materials

Study Packs & Assignments

4,2

522 revues

5
277
4
125
3
74
2
14
1
32

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions