Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

GGH3705 Assignment 2 Semester 1 Memo | Due 24 April 2025

Note
-
Vendu
-
Pages
12
Qualité
A+
Publié le
18-04-2025
Écrit en
2024/2025

GGH3705 Assignment 2 Semester 1 Memo | Due 24 April 2025. 10 Articles and 10 SIA Documents provided. Question 1 [30] Use the EIA news tool – available under web links/ resources on the GGH3705 myUnisa site – to find FIVE (5) recent news articles (not older than 2020) related to the conducting of EIAs of a current development project in South Africa. Your answer must include the following: • Provide the name of the article, the news agency which published it, and the date it was published on. • Give a short summary of the article, highlighting the primary focus points and/or conclusions. • Determine and discuss, for each of your chosen articles, whether it has a positive or negative view about the completed EIA process which was followed. Provide suitable reasons to support your answer. • In your opinion, what would you have changed about the followed EIA process. Provide reasons to support your view. Question 2 [30] A Social Impact Assessment (SIA) makes use of different primary data collection methods depending on the physical location and the community which will be impacted by the proposed development. Undertake an internet search for five (5) different social impact assessment documents compiled by five (5) different consultancies and provide the following for each in your discussion: • The name of the consultancy/ company; • A brief description of the project the SIA was compiled for; • A brief discussion on the primary data collection methods used for the project; and • An explanation as to why you think these methods were selected and used. Referencing [10] TOTAL FOR ASSIGNMENT 2: 70

Montrer plus Lire moins
Établissement
Cours









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Livre connecté

École, étude et sujet

Établissement
Cours

Infos sur le Document

Publié le
18 avril 2025
Nombre de pages
12
Écrit en
2024/2025
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

, PLEASE USE THIS DOCUMENT AS A GUIDE TO ANSWER YOUR ASSIGNMENT

Please also note that the author of this document will not be responsible for any plagiarism you
commit.

 Question 1

1. Use the EIA news tool – available under web links/ resources on the GGH3705 myUnisa site –
to find FIVE (5) recent news articles (not older than 2020) related to the conducting of EIAs of a
current development project in South Africa. Your answer must include the following:
 Provide the name of the article, the news agency which published it, and the date it was
published on.
 Give a short summary of the article, highlighting the primary focus points and/or
conclusions.
 Determine and discuss, for each of your chosen articles, whether it has a positive or negative
view about the completed EIA process which was followed. Provide suitable reasons to
support your answer.
 In your opinion, what would you have changed about the followed EIA process. Provide
reasons to support your view.


1. Southern Palladium Submits EIA for Bengwenyama Project
 News Agency: Mining Weekly
 Date Published: August 12, 2024

Summary:
Southern Palladium submitted the EIA report for its Bengwenyama platinum group metal project in
the Bushveld Complex to the Department of Mineral Resources and Energy (DMRE). The company
emphasized compliance with environmental regulations and sustainable mining practices. The EIA
process included a scoping study and consultations, culminating in the submission acknowledged by
the DMRE.

View on EIA Process:
Positive. The article highlights the company's commitment to environmental stewardship and
adherence to regulatory requirements, suggesting a thorough and responsible EIA process.

Suggested Improvements:
While the process appears comprehensive, incorporating more extensive community engagement,
especially with local stakeholders, could enhance transparency and address potential concerns early
in the project lifecycle.

(Jardim 2024)
2,93 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Aimark94 University of South Africa (Unisa)
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
6579
Membre depuis
6 année
Nombre de followers
3168
Documents
1329
Dernière vente
5 jours de cela
Simple & Affordable Study Materials

Study Packs & Assignments

4,2

522 revues

5
277
4
125
3
74
2
14
1
32

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions