Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

Test Bank for Information Technology Project Management 8th Edition by Kathy Schwalbe 9781285452340

Note
-
Vendu
-
Pages
224
Qualité
A+
Publié le
22-02-2025
Écrit en
2024/2025

Test Bank for Information Technology Project Management 8th Edition by Kathy Schwalbe 9781285452340

Établissement
Information Technology Project Management
Cours
Information Technology Project Management











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Livre connecté

École, étude et sujet

Établissement
Information Technology Project Management
Cours
Information Technology Project Management

Infos sur le Document

Publié le
22 février 2025
Nombre de pages
224
Écrit en
2024/2025
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

TEST BANK
Information Technology Project Management 8th Editionby Kathy
Schwalbe St
oi
cn
ur
se

,Chapter 1

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
TRUE


2. A research report showed that the U.S. spends $2.3 trillion on projects every year, an amount equal to 40
percent of the nation’s gross domestic product.
FALSE

3. One attribute that helps define a project is that a project has a unique purpose.
TRUE
St
4. A project should be developed using progressive elaboration, starting from specific details and broadening in
scope as it progresses.
FALSE
oi
5. Projects are often defined narrowly when they begin.
FALSE
cn
6. Projects rarely involve uncertainty.
FALSE

7. Every project is constrained in different ways by its scope and cost goals; these limitations are sometimes
referred to in project management as the double constraint.
ur
FALSE

8. Questions about how long a project’s schedule should be are related to the issue of the project’s scope.
se
FALSE

9. Because projects involve uncertainty and limited resources, projects rarely finish according to discrete scope,
time, and cost goals as originally planned.
TRUE

10. Managing the triple constraint involves making trade-offs between scope, time, and cost goals for a project.
TRUE

11. Some people refer to the “double constraint” of project management to include quality and customer
satisfaction.
FALSE

,12. In the example of building a new house, the support staff would provide the wood, windows, flooring
materials, appliances, and so on.
FALSE

13. Stakeholders’ needs and expectations are only important in the beginning of a project.
FALSE

14. There are six core knowledge areas of project management.
FALSE

15. Follow-up studies done by the Standish Group showed that the number of failed projects has more than
doubled in the past decade.
FALSE

16. The 2006 Standish Group survey showed that IT project success rates had risen from 16 percent in 1994 to
35 percent in 2006.
TRUE
St
17. Project management is the silver bullet that guarantees success on all projects.
FALSE
oi
18. A key finding of a 2004 study is that relationship management is viewed as a top success factor for
information systems in China, while it is not mentioned in U.S. studies.
TRUE
cn
19. Winners in project delivery know that strong program managers—referred to as project leaders—are crucial
to project success.
TRUE
ur
20. A program is “a group of related projects managed in a coordinated way to obtain benefits and control not
available from managing them individually.”
TRUE
se
21. Program managers are not responsible for coordinating the efforts of project teams, functional groups,
suppliers, and operations staff.
FALSE

22. The job description for a project manager can vary by industry and by organization.
TRUE

23. Project managers should possess general management knowledge and skills.
TRUE

24. Project managers must be able to make effective use of technology as it relates to the specific project.
TRUE

, 25. Project managers for large information technology projects have to be experts in the field of information
technology.
FALSE

26. Project managers often take on the role of both leader and manager.
TRUE

27. Today’s project managers still draw Gantt charts by hand.
FALSE

28. Determining the relationships among tasks is not essential in helping to improve project scheduling.
FALSE

29. New software makes basic tools, such as Gantt charts and network diagrams, inexpensive, easy to create,
and available for anyone to update.
TRUE

30. Many people still use basic productivity software, such as Microsoft Word or Excel, to perform many
St
project management functions.
TRUE
oi
31. A research report showed that the U.S. spends on projects every year.
A. $2.3 billion
B. $23 billion
C. $2.3 trillion
cn
D. $23 trillion

32. A research report showed that the U.S. spends the equivalent of percent of the nation’s gross domestic
product on projects every year.
ur
A. 10
B. 20
C. 25
se
D. 50

33. Many organizations assert that using project management provides advantages, such as .
A. lower profit margins
B. lower costs
C. less internal coordination
D. lower worker morale

34. Because a project requires resources, often from various areas, many projects cross or other
boundaries to achieve their unique purposes.
A. financial
B. spatial
C. departmental
D. technological
16,17 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
StoicNurse Chamberlain School Of Nursing
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
75
Membre depuis
1 année
Nombre de followers
8
Documents
327
Dernière vente
1 mois de cela
Stoic Nurse Nursing Exams and Test Banks

On this page, you find all five star Documents, updated Versions, and Quality Revision Questions.

3,8

8 revues

5
3
4
2
3
2
2
0
1
1

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions