CPESC Section 1 & 2 With A+ Graded And Verified
What does the acronym NPDES stand for? - correct answerNational Pollutant Discharge Elimination System
m m m m m m m m m m m m m
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal
m m m m m m m m m m m m m m m m m
separate storm drain system, to waters of the US. - correct answer2.1.1.6
m m m m m m m m m m m m m
True
What does the acronym TMDL stand for? Define it? - correct answer2.1.1.10
m m m m m m m m m m m m
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without
m m m m m m m m m m m m m m m m m m m m
violating applicable water quality standards.
m m m m m
Define TMDL - correct answer2.1.1.10 m m m m m
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without violating
m m m m m m m m m m m m m m m m m m m m
applicable water quality standards. (Water quality standards usually predetermined by the state.)
m m m m m m m m m m m m
What are the two types of storm-water permits issued under the NPDES Program? - correct answer2.2.1
m m m m m m m m m m m m m m m
1. The Construction General Permit (CGP).
m m m m m
2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m m m
If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - correct answerNo later
m m m m m m m m m m m m m m m m m m m
than seven days after the inspection.
m m m m m m
List three types of pollutants. - correct answer2.1
m m m m m m m
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances. m m m m m m m m m
List three examples of 'Waters of the United States'. - correct answer2.1.1.6
m m m m m m m m m m m
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds.
m m m m m m m m m m m m m m
When does the SWPPP need to be completed? - correct answer2.3.6.4
m m m m m m m m m m
Prior to submitting the NOI.
m m m m
When does the EPA's construction permit require inspections? - correct answerEvery 7 days, or within 24 hrs of a storm of
m m m m m m m m m m m m m m m m m m m m
0.5 inches or move in depth.
m m m m m m
What does CPESC stand for? - correct answerCertified Professional in Erosion & Sediment Control
m m m m m m m m m m m m m
What are the two types of Storm Water Permits? - correct answer2.2.1
m m m m m m m m m m m m
1. General: provides umbrella coverage to a large number of applicants.
m m m m m m m m m m
m 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m
True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to obtain a permit
m m m m m m m m m m m m m m m m m m m m m m
for the 1/2 acre. - correct answer2.1.1.8
m m m m m m m
False, If it as part of a larger plan of development >1 acre, a permit is required.
m m m m m m m m m m m m m m m m
Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - correct answer2.1.1.2
m m m m m m m m m m m m m m m m m m m m m
-Facilities already covered by a permit m m m m m
-Facilities that engage in industrial activity m m m m m
-Large (>250K pop) MS4s m m m
-Medium (100K250K) MS4s m m
-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
m m m m m m m m m m
Who is responsible for applying for the Storm water permit for a construction site? - correct answer2.3.1
m m m m m m m m m m m m m m m m
The operator of the site, however a owner can apply if the operator has not been identified.
m m m m m m m m m m m m m m m m
What is an NOI? - correct answer2.2.4
m m m m m m
"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
m m m m m m m m m m m m m m m m m m
, List the 6 major phases of a SWPPP for construction activities? - correct answer2.3.6
m m m m m m m m m m m m m
-Site Evaluation/design development (site plan)
m m m m
-Assessment (site area/runoff calc) m m m
-Control selection and plan design (BMPs) m m m m m
-Certification/notification (NOI) m
-Construction/implementation (install/maintenance) m
-Final stabilization/termination (NOT)
m m
What score do you need to pass each section of the test? - correct answer70%
m m m m m m m m m m m m m m
What is the deadline to stabilize a site that wont be redisturbed? - correct answer2.3.6.3
m m m m m m m m m m m m m m m
14 days m
What is the deadline to correct problems found during an inspection? - correct answer2.3.6.5
m m m m m m m m m m m m m m
As soon as possible but no later than 7 days.
m m m m m m m m m
How long do you have to keep copies of the swppp after final stabilization? - correct answer2.3.6.5 (second to last
m m m m m m m m m m m m m m m m m m m
paragraph)
m m
3 years
m
What are the 3 types of enforcement actions EPA has? - correct answer2.3.7
m m m m m m m m m m m m
-Administrative Orders m
-Civil Actions m
-Criminal Prosecutions m
The Federal Water Pollution Control Act was established which year? - correct answer1948
m m m m m m m m m m m m
When was the Federal Water Pollution Control Act amended? What is it called now? - correct answer2.1.1
m m m m m m m m m m m m m m m m
1972 and 1977. Now called the Clean Water Act
m m m m m m m m
Which year was the National Pollutant Discharge Elimination System established? - correct answer2.1.1.2
m m m m m m m m m m m m
1972
What is an MS4? - correct answerMunicipal Separate Storm Sewer System
m m m m m m m m m m
Stormwater is defined under EPA's NPDES rules as . . . - correct answer2.1.1.5
m m m m m m m m m m m m m
Stormwater runoff, snow melt runoff, and surface runoff and drainage.
m m m m m m m m m
Who is allowed to certify the SWPPP? - correct answerThe authorized representative of the site operator, such as the
m m m m m m m m m m m m m m m m m m
president, vice president, or a general partner who has been delegated authority to sign and certify this type of document.
m m m m m m m m m m m m m m m m m m m m
Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - correct answer* Integrity
m m m m m m m m m m m m m m m
* Objectivity
m
* Confidentiality
m
* Competence
m
* Professionalism
m
Who oversees Stormwater Regulations ? - correct answerEPA (US Environmental Protection Agency)
m m m m m m m m m m m
When was the Stormwater Application Rule issued? - correct answerNovember 16th, 1990
m m m m m m m m m m m
When was the Stormwater Implementation Rule enacted and what did it entail? - correct answerApril 1992; minimum
m m m m m m m m m m m m m m m m
requirements for storm water permit terms and conditions
m m m m m m m m
What does the Phase II discharger's include and when were they established? - correct answerPhase II stormwater
m m m m m m m m m m m m m m m m
dischargers generally include "light" industrial facilities, small construction sites (< 5 acres), and small municipalities
m m m m m m m m m m m m m m m
(<100,000 population)
m m
August 1995 m
When was the Multi Sector Model General Permit issued? - correct answerSeptember 1995
m m m m m m m m m m m m
What does the acronym NPDES stand for? - correct answerNational Pollutant Discharge Elimination System
m m m m m m m m m m m m m
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal
m m m m m m m m m m m m m m m m m
separate storm drain system, to waters of the US. - correct answer2.1.1.6
m m m m m m m m m m m m m
True
What does the acronym TMDL stand for? Define it? - correct answer2.1.1.10
m m m m m m m m m m m m
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without
m m m m m m m m m m m m m m m m m m m m
violating applicable water quality standards.
m m m m m
Define TMDL - correct answer2.1.1.10 m m m m m
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without violating
m m m m m m m m m m m m m m m m m m m m
applicable water quality standards. (Water quality standards usually predetermined by the state.)
m m m m m m m m m m m m
What are the two types of storm-water permits issued under the NPDES Program? - correct answer2.2.1
m m m m m m m m m m m m m m m
1. The Construction General Permit (CGP).
m m m m m
2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m m m
If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - correct answerNo later
m m m m m m m m m m m m m m m m m m m
than seven days after the inspection.
m m m m m m
List three types of pollutants. - correct answer2.1
m m m m m m m
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances. m m m m m m m m m
List three examples of 'Waters of the United States'. - correct answer2.1.1.6
m m m m m m m m m m m
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds.
m m m m m m m m m m m m m m
When does the SWPPP need to be completed? - correct answer2.3.6.4
m m m m m m m m m m
Prior to submitting the NOI.
m m m m
When does the EPA's construction permit require inspections? - correct answerEvery 7 days, or within 24 hrs of a storm of
m m m m m m m m m m m m m m m m m m m m
0.5 inches or move in depth.
m m m m m m
What does CPESC stand for? - correct answerCertified Professional in Erosion & Sediment Control
m m m m m m m m m m m m m
What are the two types of Storm Water Permits? - correct answer2.2.1
m m m m m m m m m m m m
1. General: provides umbrella coverage to a large number of applicants.
m m m m m m m m m m
m 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m
True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to obtain a permit
m m m m m m m m m m m m m m m m m m m m m m
for the 1/2 acre. - correct answer2.1.1.8
m m m m m m m
False, If it as part of a larger plan of development >1 acre, a permit is required.
m m m m m m m m m m m m m m m m
Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - correct answer2.1.1.2
m m m m m m m m m m m m m m m m m m m m m
-Facilities already covered by a permit m m m m m
-Facilities that engage in industrial activity m m m m m
-Large (>250K pop) MS4s m m m
-Medium (100K250K) MS4s m m
-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
m m m m m m m m m m
Who is responsible for applying for the Storm water permit for a construction site? - correct answer2.3.1
m m m m m m m m m m m m m m m m
The operator of the site, however a owner can apply if the operator has not been identified.
m m m m m m m m m m m m m m m m
What is an NOI? - correct answer2.2.4
m m m m m m
"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
m m m m m m m m m m m m m m m m m m
, List the 6 major phases of a SWPPP for construction activities? - correct answer2.3.6
m m m m m m m m m m m m m
-Site Evaluation/design development (site plan)
m m m m
-Assessment (site area/runoff calc) m m m
-Control selection and plan design (BMPs) m m m m m
-Certification/notification (NOI) m
-Construction/implementation (install/maintenance) m
-Final stabilization/termination (NOT)
m m
What score do you need to pass each section of the test? - correct answer70%
m m m m m m m m m m m m m m
What is the deadline to stabilize a site that wont be redisturbed? - correct answer2.3.6.3
m m m m m m m m m m m m m m m
14 days m
What is the deadline to correct problems found during an inspection? - correct answer2.3.6.5
m m m m m m m m m m m m m m
As soon as possible but no later than 7 days.
m m m m m m m m m
How long do you have to keep copies of the swppp after final stabilization? - correct answer2.3.6.5 (second to last
m m m m m m m m m m m m m m m m m m m
paragraph)
m m
3 years
m
What are the 3 types of enforcement actions EPA has? - correct answer2.3.7
m m m m m m m m m m m m
-Administrative Orders m
-Civil Actions m
-Criminal Prosecutions m
The Federal Water Pollution Control Act was established which year? - correct answer1948
m m m m m m m m m m m m
When was the Federal Water Pollution Control Act amended? What is it called now? - correct answer2.1.1
m m m m m m m m m m m m m m m m
1972 and 1977. Now called the Clean Water Act
m m m m m m m m
Which year was the National Pollutant Discharge Elimination System established? - correct answer2.1.1.2
m m m m m m m m m m m m
1972
What is an MS4? - correct answerMunicipal Separate Storm Sewer System
m m m m m m m m m m
Stormwater is defined under EPA's NPDES rules as . . . - correct answer2.1.1.5
m m m m m m m m m m m m m
Stormwater runoff, snow melt runoff, and surface runoff and drainage.
m m m m m m m m m
Who is allowed to certify the SWPPP? - correct answerThe authorized representative of the site operator, such as the
m m m m m m m m m m m m m m m m m m
president, vice president, or a general partner who has been delegated authority to sign and certify this type of document.
m m m m m m m m m m m m m m m m m m m m
Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - correct answer* Integrity
m m m m m m m m m m m m m m m
* Objectivity
m
* Confidentiality
m
* Competence
m
* Professionalism
m
Who oversees Stormwater Regulations ? - correct answerEPA (US Environmental Protection Agency)
m m m m m m m m m m m
When was the Stormwater Application Rule issued? - correct answerNovember 16th, 1990
m m m m m m m m m m m
When was the Stormwater Implementation Rule enacted and what did it entail? - correct answerApril 1992; minimum
m m m m m m m m m m m m m m m m
requirements for storm water permit terms and conditions
m m m m m m m m
What does the Phase II discharger's include and when were they established? - correct answerPhase II stormwater
m m m m m m m m m m m m m m m m
dischargers generally include "light" industrial facilities, small construction sites (< 5 acres), and small municipalities
m m m m m m m m m m m m m m m
(<100,000 population)
m m
August 1995 m
When was the Multi Sector Model General Permit issued? - correct answerSeptember 1995
m m m m m m m m m m m m