Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

PRO4801 assignment 4 2024 (Full solutions)

Note
-
Vendu
1
Pages
16
Qualité
A+
Publié le
26-06-2024
Écrit en
2023/2024

100% accurate and reliable assignment solutions for PRO4801 assignment 4 2024: Due date 28 June 2024.

Établissement
Cours










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Livre connecté

École, étude et sujet

Établissement
Cours

Infos sur le Document

Publié le
26 juin 2024
Nombre de pages
16
Écrit en
2023/2024
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

PRO4801 Assignment 4 2024
Unique Number:

DUE DATE: 28 June 2024


Terms of use
By making use of this document you agree to:
 Use this document as a guide for learning,
comparison and reference purpose,
 Not to duplicate, reproduce and/or misrepresent the
contents of this document as your own work,
 Fully accept the consequences should you plagiarise
or misuse this document.




Disclaimer
Extreme care has been used to create this
document, however the contents are provided “as
is” without any representations or warranties,
express or implied. The author assumes no
liability as a result of reliance and use of the
contents of this document. This document is to
be used for comparison, research and reference
purposes ONLY. No part of this document may be
reproduced, resold or transmitted in any form or
by any means.

, 0688120934

PREVIEW


Question 4.1
The statement that "when uncertainty drops to nearly zero, and when effort is repeated a
large number of times, the work is no longer considered a project" is a bold assertion that
may seem counterintuitive to many. However, upon deeper analysis and understanding
of the nature of projects, it becomes apparent that there is merit to this statement.


The prescribed book "Project Management Concepts" provides a comprehensive
overview of the key principles and concepts related to project management. Figure 1.3,
which depicts a topology of projects, illustrates the relationship between uncertainty and
effort in the context of different types of work. This figure categorizes work into four main
types: basic work, developmental work, complexity work, and pure project work. Each
type of work is characterized by varying levels of uncertainty and effort.


Basic work is depicted as having low uncertainty and low effort, while developmental work
involves moderate uncertainty and moderate effort. Complexity work is shown to have
high uncertainty and high effort, and pure project work is presented as having very high
uncertainty and very high effort. The topology of projects Figure 1.3 thus provides a visual
representation of how uncertainty and effort are interconnected in different types of work.


When considering the statement that "when uncertainty drops to nearly zero, and when
effort is repeated a large number of times, the work is no longer considered a project," it
is important to examine the nature of projects and how they are distinguished from routine
or non-project work. According to the Project Management Institute (PMI), a project is
defined as a temporary endeavor undertaken to create a unique product, service, or
result. Projects are characterized by their specific objectives, defined start and end dates,
and finite resources.



Disclaimer
Extreme care has been used to create this document, however the contents are provided “as is”
without any representations or warranties, express or implied. The author assumes no liability as
a result of reliance and use of the contents of this document. This document is to be used for
comparison, research and reference purposes ONLY. No part of this document may be
reproduced, resold or transmitted in any form or by any means.

, 0688120934




Question 4.1
The statement that "when uncertainty drops to nearly zero, and when effort is repeated a
large number of times, the work is no longer considered a project" is a bold assertion that
may seem counterintuitive to many. However, upon deeper analysis and understanding
of the nature of projects, it becomes apparent that there is merit to this statement.


The prescribed book "Project Management Concepts" provides a comprehensive
overview of the key principles and concepts related to project management. Figure 1.3,
which depicts a topology of projects, illustrates the relationship between uncertainty and
effort in the context of different types of work. This figure categorizes work into four main
types: basic work, developmental work, complexity work, and pure project work. Each
type of work is characterized by varying levels of uncertainty and effort.


Basic work is depicted as having low uncertainty and low effort, while developmental work
involves moderate uncertainty and moderate effort. Complexity work is shown to have
high uncertainty and high effort, and pure project work is presented as having very high
uncertainty and very high effort. The topology of projects Figure 1.3 thus provides a visual
representation of how uncertainty and effort are interconnected in different types of work.


When considering the statement that "when uncertainty drops to nearly zero, and when
effort is repeated a large number of times, the work is no longer considered a project," it
is important to examine the nature of projects and how they are distinguished from routine
or non-project work. According to the Project Management Institute (PMI), a project is
defined as a temporary endeavor undertaken to create a unique product, service, or
result. Projects are characterized by their specific objectives, defined start and end dates,
and finite resources.

Disclaimer
Extreme care has been used to create this document, however the contents are provided “as is”
without any representations or warranties, express or implied. The author assumes no liability as
a result of reliance and use of the contents of this document. This document is to be used for
comparison, research and reference purposes ONLY. No part of this document may be
reproduced, resold or transmitted in any form or by any means.
10,64 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Melindatutor Abbott's College
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
1555
Membre depuis
6 année
Nombre de followers
914
Documents
419
Dernière vente
1 mois de cela

4,0

168 revues

5
85
4
37
3
25
2
5
1
16

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions