COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified.
COSC 275 Exam 2 (Palmer) Questions And Answers 100% Verified. Hard bid low price - answerOwner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - answerInvolves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR - answerConstruction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. Design Build - answerOnly one contract - between owner and design-build contractor May be one entity or contractor and architect in a contract. most common steel type? a) A529 - 50 KSI b) A36 - 36 KSI - answera) A529 - 50 KSI Weathering steel a)A242 b)A585 c) both - answerc) Both W - answerwide flange S - answerI beam M - answermiscellaneous
École, étude et sujet
- Établissement
- Cosc
- Cours
- Cosc
Infos sur le Document
- Publié le
- 24 juin 2024
- Nombre de pages
- 6
- Écrit en
- 2023/2024
- Type
- Examen
- Contenu
- Questions et réponses
Sujets
-
cosc 275 exam 2 palmer questions and answers 100
Document également disponible en groupe