MNM2601 Ass 05
Q1: Choose the correct options. When work arrives, decisions must be taken
regarding the order in which work will be done. The various sequencing rules
include:
a. physical constraints
b. due date
c. backward scheduling
d. forward scheduling
e. customer priority
f. last in first out
g. push and pull control
h. trial and error control
i. longest operating time
1. a,b,e,f,i
2. a,b,e,f,g
3. c,d,e,f,g
4. d,e,f,g,h
5. b,e,f,g,i
Q2: Choose the correct option. The nature of jobs have changed significantly over
the last few years. What types of flexible working options are available?
a. flexibility
b. skills
c. time
d. quality
e. location
f. speed
1. a,b,c
2. c,d,e
3. d,e,f
4. b,c,e
5. b,c,d
Q1: Choose the correct options. When work arrives, decisions must be taken
regarding the order in which work will be done. The various sequencing rules
include:
a. physical constraints
b. due date
c. backward scheduling
d. forward scheduling
e. customer priority
f. last in first out
g. push and pull control
h. trial and error control
i. longest operating time
1. a,b,e,f,i
2. a,b,e,f,g
3. c,d,e,f,g
4. d,e,f,g,h
5. b,e,f,g,i
Q2: Choose the correct option. The nature of jobs have changed significantly over
the last few years. What types of flexible working options are available?
a. flexibility
b. skills
c. time
d. quality
e. location
f. speed
1. a,b,c
2. c,d,e
3. d,e,f
4. b,c,e
5. b,c,d