SUB – STRUCTURE (CONCRETE PART)
1. INTRODUCTION
2. THE BASICS
3. FOOTING
4. FOOTING PCC
5. NECK COLUMN
6. TIE BEAM
7. TIE BEAM PCC
8. PLINTH BEAM
9. PLINTH BEAM PCC
10 GRADE SLAB
11. RETAINING WALL
12. RECTANGULAR SUMP
13. EXCAVATION & BACKFILL
14. SUB – STRUCTURE ABSTRACT
15. BOQ OF SUB – STRUCTURE
SUPER – STRUCTURE (CONCRETE PART)
16. FLOOR COLUMN
17. FLOOR BEAM
18. SLAB
19.STAIRCAS
20.BRICKWORK
21. PLASTERING
22. WALL PUTTY
23. PAINT
24. FLOORING
25. FALSE CEILING
26. DOORS & WINDOWS
27. LINTELS
, 28. SUPER – STRUCTURE ABSTRACT - 1
29. SUPER – STRUCTURE ABSTRACT - 2
30. BOQ OF SUPER – STRUCTURE
31. BAR BENDING SCHEDULE
SUB – STRUCTURE (REINFORCEMENT PART)
32. FOOTING
33. NECK COLUMN
34. TIE BEAM
35. PLINTH BEAM
36. GRADE SLAB
37. RETAINING WALL
38. RECTANGULAR SUMP
39. SUB – STRUCTURE ABSTRACT
40. BOQ OF SUB – STRUCTURE
SUPER – STRUCTURE (REINFORCEMENT PART)
41. FLOOR COLUMN
42. FLOOR BEAM
43. SLAB
44. STAIRCASE
45. SUPER – STRUCTURE REINFORCEMENT ABSTRACT
46. BOQ OF SUPER – STRUCTURE REINFORCEMENT
47. COMPLETE BILL OF QUANTITY OF SAMPLE PROJECT
,1.QUANTITY SURVEY: IT IS A PROCESS IN WHICH, QUANTITIES OF
ALL THE CONSTRUCTION MATERIALS ARE ESTIMATED AND
COST OF THE PROJECT IS DERIVED.
100 BAGS OF CEMENT
GRADE 43 CEMENT AMBUJA BRAND
450 RS MARKET VALU
, COSTING
2.BASIC EXECUTION PROCESS: