Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

WASTEWATER CLASS B TX 2026 CORE EXAM TEST QUESTIONS AND ANSWERS GRADED A+

Note
-
Vendu
-
Pages
15
Qualité
A+
Publié le
05-01-2026
Écrit en
2025/2026

WASTEWATER CLASS B TX 2026 CORE EXAM TEST QUESTIONS AND ANSWERS GRADED A+

Établissement
WASTEWATER CLASS B
Cours
WASTEWATER CLASS B









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
WASTEWATER CLASS B
Cours
WASTEWATER CLASS B

Infos sur le Document

Publié le
5 janvier 2026
Nombre de pages
15
Écrit en
2025/2026
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

WASTEWATER CLASS B TX 2026 CORE EXAM TEST
QUESTIONS AND ANSWERS GRADED A+
✔✔trench is 4,100 feet long, four 4 wide and 6 feet deep. There is a 12-inch diameter
pipe in the bottom of the trench. How many cubic yards of material were removed from
the trench? 4x6x4,100 3,644 27 - ✔✔3,644

✔✔In the problem above, how many cubic yards of material will be required to fill the
trench? 3.14x0.5 x0.5 x 4,100 =119cu yds 27 3,644 -119 = 3,525 - ✔✔3,525

✔✔What is the standard chlorine residual and contact time on Texas discharge
permits? - ✔✔e. None of the above organization increases,

✔✔As the complexity of an organization increases, what management function
becomes most important? - ✔✔Planning

✔✔The following scenario is to be used in answering questions 38, 39, and 40. A pump
with a 15-inch impeller is running at 1170 RPM s, with pump efficiency of 75%, and is
pumping 500 gpm with 75 feet of head. If the RPM of the pump is increased to 1750
RPMS calculate the following: New output in gpm: - ✔✔1750 1770 =F = 1.5 500 x 1.5 =
750 gpm 750

✔✔New head in feet: 75 x 1.5 x 1.5 = 168.75 - ✔✔170

✔✔New horsepower required: - ✔✔750 x 170 - 43 3960 x 0.75 a. 43

✔✔What compound or compounds are formed when Cl, combines with water? -
✔✔Both a and d

✔✔When chlorinating treated wastewater, what chlorine residual do we test for? -
✔✔Chloramine and Total

✔✔What is the standard pH range on Texas effluent discharge permits? - ✔✔b. 6.0 to
9.0

✔✔A wastewater treatment plant has a clarifier that is 80 feet in diameter and is 12 feet
deep. The flow is 2.5 mgd. The single weir is two feet inside the outer wall and is 3 feet
deep. What is the clarifier detention time in hours? - ✔✔What is the clarifier detention
time in hours? 2,500,000 gpd - 104,167 gph 24 hrs/day 3.14 x 40 x 40 x 9 x 7.48 gal
3.14 x 36 x 36 x 3 x 7.48 = 91,318 338,216 + 91,318 429,534 gallons 429,534 gals =
4.1 hrs 104,167 gph 4.1

, ✔✔What is the hydraulic loading on the clarifier in gal/sq ft/day? - ✔✔3.14 x 38 x 38 =
4,534 sq ft 2,500,000 gpd = 551 gal / sq ft I day 4,534 sq ft 551

✔✔What is the weir loading in gal/linear ft/day? 3.14 x 76 = 239 ft of weir 2,500,000 gpd
= 10,460 gal / lin ft / day 239 ft weir - ✔✔10,460

✔✔In Texas, an oxidation ditch treatment plant is referred to as - ✔✔Racetrack

✔✔In Texas, pH meters are required to be calibrated on how many buffers? - ✔✔two

✔✔An industrial complex has a BOD discharge to the POTW of 500 pounds per
population equivalent of this industry is - ✔✔500 lbs - 2,941 0.17 lbs BOD/ person 2941

✔✔What substance will interfere with a DPD chlorine test? - ✔✔Manganese

✔✔The parameters of the BOD test are - ✔✔5 days at 20° Centigrade

✔✔An Imhoff tank is what type of treatment process? - ✔✔Primary

✔✔Standard Dimension Ratio in pve pipe is defined as - ✔✔Ratio of OD pipe diameter
to wall thickness

✔✔MSDS sheets must be kept for how many years after you have stopped using the
chemical? - ✔✔c. 30

✔✔A pneumatic ejector is - ✔✔a. a lift station pumping device

✔✔How should shoring be removed from a trench? - ✔✔d. from the bottom up

✔✔57. The most common pump used in the collection system is - ✔✔d. centrifugal

✔✔In low pressure sewer systems where each tap must have a grinder pump lift
station, the lift station is considered to be - ✔✔Part of the collection system and the
responsibility of the utility

✔✔Effective communication depends on - ✔✔being a good listener

✔✔A construction site safety evaluation checklist must include - ✔✔a. placement of
equipment, vehicles, and spoil bank b. placement of flaggers, barricades, cones and
other safety equipment c. use of warning signs

✔✔When designing a wastewater collection system, the engineer considers the
population for how many years in the future? - ✔✔50
11,08 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
BOARDWALK Havard School
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
181
Membre depuis
1 année
Nombre de followers
6
Documents
24136
Dernière vente
3 heures de cela
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3,7

33 revues

5
14
4
6
3
7
2
0
1
6

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions