NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+ Construction issues - -Transitory nature of workers Temporary nature of construction activities and the constantly changing workplace Time pressures from clients and principal contractors Weather conditions Levels of num...

[Montrer plus]

Aperçu 3 sur 27  pages

  • 13 juin 2023
  • 27
  • 2022/2023
  • Examen
  • Questions et réponses
avatar-seller
NEBOSH NCC1, Top Exam Questions
and answers, 100% Accurate. Graded A+

Construction issues - ✔✔-Transitory nature of workers

Temporary nature of construction activities and the constantly changing workplace

Time pressures from clients and principal contractors

Weather conditions

Levels of numeracy and literacy of workers

Non-English speaking workers



High risk areas for injuries in construction - ✔✔-Falls from height

Slips, trips and falls

Being struck by falling/moving objects

Manual handling



Construction (Design and Management) Regulations 2007 - ✔✔-Apply to all construction projects

Duties placed on clients, designers and all construction workers



CDM regs - notifiable projects - ✔✔-Construction phase will last longer than 30 days

Construction phase will involve more than 500 person days at work



Duty holders for notifiable projects - ✔✔-Client - have most influence

Designers - have responsibility beyond construction phase

Contractors - competence

CDM Co-ordinator - advise client of their duties, co- ordinates others

Principal contractor - safe working, co- ordination and co-operation between contractors

,CDM client duties - ✔✔-Appoint competent persons

Ensure suitable mgmt of welfare

Allow sufficient time and resources

Provide pre-construction info

Appoint duty holders for notifiable projects

Retain and provide access to health and safety file



CDM co-ordinator CDM duties - ✔✔-Advise and assist client with their duties

Notify HSE

Co-ordinate H&S aspects of design work and co-operate with others

Facilitate good communication

Liaise with principal contractor re ongoing design

Pass on pre-construction information

Prepare/update H&S file



Designer CDM duties - ✔✔-Check client is aware of their duties

Eliminate hazards and reduce risks during design

Provide information about remaining risks

Check CDM co-ordinator has been appointed

Provide any information needed for H&S file



Principal contractors CDM duties - ✔✔-Plan, manage and monitor construction phase

Prepare, develop and implement a written plan and site rules

Give contractors relevant parts of the plan

Provide suitable welfare facilities

Check competence of all appointees

Site inductions and further info and training

Consult with workers

, Liaise with CDM-c

Secure the site



Contractor CDM duties - ✔✔-Check client aware of duties

Plan, manage and monitor own work and that of workers

Check competence

Train own employees

Comply with part 4 of CDM regs

Ensure adequate welfare facilities

Co-operate with principal contractor



Pre-construction information - ✔✔-Description of the project

Management requirements and provisions

Environmental restrictions and existing risks on site

Design and construction hazards

Health and safety file



Construction phase H&S plan - ✔✔-Relevant info from pre-construction information

Project description and programme or works with key dates

Identify the organisation in place (mgmt structure, responsibilities and "who does what")

Identify arrangements in place to manage H&S risks

Show how construction work will be co-ordinated and how consultation will be achieved

Contain the H&S file



Health and safety file contains: - ✔✔-Brief description of the work carried out

As built dwgs

Survey info (e.g. Asbestos) and groundwork plans

Location of services

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur PassPoint02. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €10,87. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

85443 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€10,87  1x  vendu
  • (0)
  Ajouter