Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Resume

Samenvatting Project Management Advanced

Note
-
Vendu
-
Pages
21
Publié le
31-01-2023
Écrit en
2020/2021

Een samenvatting van het vak Project management advanced.











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Infos sur le Document

Publié le
31 janvier 2023
Nombre de pages
21
Écrit en
2020/2021
Type
Resume

Sujets

Aperçu du contenu

1. Project initiation
o First phase = start project
o Business case:
 Detailed description problem/opportunity
- Introduction, business objectives, problem/opp statement,
assumptions, limitations
 Alternative solutions
 Analysis of business benefits, costs, risks, issues
 Description preferred solution
 Project requirements
 Summarized plan --> schedule + financial analysis
o Project sponsor approves business case + required funding is allocated
--> proceed feasibility study --> PS determine if it’s worth it/ profitable
o Completion + approval feasibility study = start planning phase
o Success of project
 Depends on clarity + accuracy business case
 Interpreted in multiple ways = lacks clarity
 Best way to make objective clear = state it so it can be verified

2. The project charter
o Purpose:
 Provides understanding, reason, justification of project
 Establish general scope
 Establish project manager + his authority
 Includes who reviews + approves project charter
o Includes:
 An identification section
 The overview of the project
 The objective
 The scope
 Major milestones
 Major deliverables
 Assumptions
 Constraints
 Business need or opportunity
 Preliminary cost
 Project risks
 Project charter acceptance
 Project stakeholders

3. project planning phase
o Purpose:
 Establish business requirements
 Establish cost, schedule, deliverables, delivery dates
 Establish resources plans
 Obtain management approval

, o Basic processes
 Scope planning
 Preparation WBS
 Project schedule development
 Recourse planning
 Budget planning
 Purchase planning
 Risk management
 Quality planning
 Communication planning
o Project requirements
 Requirements describe characteristics of final deliverable
 Specific requirements the final deliverable must have to satisfy
objectives of project
 Six categories:
- Functional = WHAT deliverable must do
- Non-functional = specify criteria -> performance, development
(time, resource, quality)
- Technical = HOW it needs to be designed
- Business = The needs of the sponsoring organization, from a
management perspective.
- User = what user needs to do with it
- Regulatory = Can be internal or external, are usually non-
negotiable: restrictions, licenses, laws
o Scope inputs
 ->




o WBS
 ->




4. The scope statement
o Details project deliverables + describes major objectives
o Objectives should include measurable success criteria
o Contain
 Project name
 Project charter
 Owner, sponsors, stakeholders
 Problem statement
 Project goals + objectives
 Project requirements
 Project deliverables

,  Non-goals
 Milestones
 Cost estimates

5. Project schedule planning
o Defining activities
 Further breakdown of work package elements of WBS
 Individual units of work --> complete to fulfill deliverables
 Uses everything we know about project to divide work into activities
that can be estimated
o Activity list
 Everything that needs to be done to complete project
 Including all activities that must be accomplished to deliver each
work package
 Kinds of predecessors:
- Finish-to-start: first activity needs to be finished before next
one can start
- Start-to-finish: first an activity needs to start before the activity
can finish
- Finish-to-finish: both activities need to end together.
- Start-to-start: both activities need to begin at the same
moment.
- External predecessors: depends on things outside your project
- Discretionary predecessors: if you want
- Mandatory predecessors: have to exist because of the nature
of the work
 Leads/ Lags
- Lag time = put a delay
- Lead time = give successor task some time to get started
before predecessor finishes
o Milestones
 Important checkpoints
 Some can be contracted -> requirement of successful completion
 Some can be significant points -> keep track of
 Milestone list -> let know which are required an which not
o Network diagram
 ->



o Gantt chart
 ->
€5,99
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
emielkennis37
5,0
(1)

Faites connaissance avec le vendeur

Seller avatar
emielkennis37 Syntra West
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
6
Membre depuis
3 année
Nombre de followers
2
Documents
14
Dernière vente
1 année de cela

5,0

1 revues

5
1
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions