Garantie de satisfaction à 100% Disponible immédiatement après paiement Lire en ligne ou en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Resume

Summary Project Management Revision Poster

Note
-
Vendu
-
Pages
2
Publié le
22-10-2022
Écrit en
2015/2016

Project Management Revision Poster for ME20026 Manufacturing operations and technology

Établissement
Cours

Aperçu du contenu

ME20026: PROJECT MANAGEMENT: ME20026: PROJECT MANAGEMENT
PROJECT CONTROLS: NETWORK DIAGRAMS:
Definition:  Used to show interdependency logic of a project in order to perform CPA and PERT
 Techniques to ensure that a project is completed on  Types of diagrams
time and within budget o Activity-on-Arrow
 Nb a project is a temporary endeavour undertaken o Activity-on-Node
to create a unique product, service or result
Activity-On-Arrow (AoA) diagrams: Dummy Activity:
Diagrams composed of two symbols:
 An activity with zero duration
PROJECT TIMING: Event Event has zero time duration  Used when it becomes necessary to draw two
Represents a single state in the activities with same start and finish events
Must have the following information project
 Activities required to achieve project goal i.e denotes the start or end of an Incorrect Correct
o The list of every action that should be completed activity or a set of activities
for the project to succeed
 Time required to finish each activity Activity Activity has a time and name
 Resources required to finish each activity including associated with it
o People
o Tools
o Machines
o Infrastructure
 Interdependencies of activities on each other (logic)
 An activity starts from an event and ends with an event e.g.
o Highlighting the temporal order of the activities
in relationship to other activities
 i.e. when an activity can only start when
certain other activities have been
completed
o Event 1 represents initial state of a project
Techniques used for time management in a project: o Activity A represents the act needed to reach event 2
 Gantt charts o Event 2 is the final state of the project
 Network diagrams
 Critical path analysis (CPA)  Logic of AoA is based on two principles
 Project evaluation and review technique o An event does not happen until all activities leading to it are
(PERT) complete
o No activity can start until its start event is complete
 Constraints of AoA
GANNT CHART:
o A network is a collection of interrelated events and activities
 A bar chart that shows the activity breakdown of
o A network should start and end with an event (called start and end)
the project on one axis and the timings of the tasks
o Time moves from left to right
on the other axis
 Time dependencies and resources for each task o The start event is the only event in the network without activities
can also be displayed on these charts leading into it
 Simple to use and understand o The end event is the only event in the network without activities
 Can be used for presenting time elements of leading out
projects in a simple manner o Loops are disallowed and no two activities can have both the same
start and same end events

École, étude et sujet

Établissement
Cours
Inconnu
Cours

Infos sur le Document

Publié le
22 octobre 2022
Nombre de pages
2
Écrit en
2015/2016
Type
RESUME

Sujets

€9,51
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
Lire en ligne ou en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
zarazaman1

Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
zarazaman1 University of Bath
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
1
Membre depuis
3 année
Nombre de followers
1
Documents
11
Dernière vente
1 année de cela

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Documents populaires

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions