Charlene's Scholastic Emporium.
Your Actual and Virtual Exam Tests Excellent Tutor.
- 10032
- 0
- 757
Community
- Seguidores
- Siguiendo
35 Comentarios recibidos
7 artículos
API 1169 Bundled Exams Questions and Answers 100% Verified and Updated 2024 | Graded A
API 1169 Bundled Exams Questions and Answers 100% Verified and Updated 2024 | Graded A
- Lote
- • 3 artículos •
API 1169 Bundled Exams Questions and Answers 100% Verified and Updated 2024 | Graded A
API 1169 Study test questions test RM#3 with 100% Correct Answers
API 1169 Study test questions test 
RM#3 with 100% Correct Answers 
One main category variable of pressure test planning that an operator must consider is 
the _________________. - Answer- purpose 
Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the 
company. - Answer- True 
Location of casings cathode protection external anodes, and utility crossings should all 
be recorded on the. - Answer- as-built drawings 
Releasing air or water pressure through valves, a...
- Examen
- • 16 páginas •
API 1169 Study test questions test 
RM#3 with 100% Correct Answers 
One main category variable of pressure test planning that an operator must consider is 
the _________________. - Answer- purpose 
Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the 
company. - Answer- True 
Location of casings cathode protection external anodes, and utility crossings should all 
be recorded on the. - Answer- as-built drawings 
Releasing air or water pressure through valves, a...
API 1169 INGAA Defs Exam Questions and Answers 100% Correct
API 1169 INGAA Defs Exam Questions and 
Answers 100% Correct 
Active Excavation Area - Answer- is the area where the edge of the disturbance is 
within 25 feet of the centerline of existing facilities. 
Crossing Agreement - Answer- is the agreement entered into between the Owner of the 
existing facility and Crossing Company installing the new facility to specify the rights 
and obligations of the parties during the Crossing Construction. 
Crossing Angle - Answer- is the angle measured between t...
- Examen
- • 3 páginas •
API 1169 INGAA Defs Exam Questions and 
Answers 100% Correct 
Active Excavation Area - Answer- is the area where the edge of the disturbance is 
within 25 feet of the centerline of existing facilities. 
Crossing Agreement - Answer- is the agreement entered into between the Owner of the 
existing facility and Crossing Company installing the new facility to specify the rights 
and obligations of the parties during the Crossing Construction. 
Crossing Angle - Answer- is the angle measured between t...
API 1169 Exam Questions and Answers 100% Correct
API 1169 Exam Questions and Answers 100% Correct 
Which of the following equipment may NOT be required for a pressure test? - Answer- 
internal line clamps 
before testing begins, a ________ with explanatory notes and data should be prepared 
- Answer- pressure test procedure 
the pressure testing of newly constructed liquid pipelines and replaced segments of 
existing pipelinesshould be performed in accordance with - Answer- ASME B31.4, 49 
Code of Federal Regulations, Part 195 and any other ap...
- Examen
- • 22 páginas •
API 1169 Exam Questions and Answers 100% Correct 
Which of the following equipment may NOT be required for a pressure test? - Answer- 
internal line clamps 
before testing begins, a ________ with explanatory notes and data should be prepared 
- Answer- pressure test procedure 
the pressure testing of newly constructed liquid pipelines and replaced segments of 
existing pipelinesshould be performed in accordance with - Answer- ASME B31.4, 49 
Code of Federal Regulations, Part 195 and any other ap...
API 1169 Exam Questions and Answers 100% Correct
API 1169 Exam Questions and Answers 100% Correct 
FERC - Answer- Federal Energy Regulatory Commission 
OSHA - Answer- Occupational Safety and Hazard Administration 
PHMSA - Answer- Pipeline Hazardous Materials and Safety Administration 
INGAA - Answer- Interstate Natural Gas Association of America 
CFR - Answer- Code of Federal Regulations 
EPA - Answer- Environmental Protection Act 
CERCLA - Answer- Comprehensive Environmental Response, Compensation and 
Liability Act also known as Superfund 
C...
- Package deal
- Examen
- • 5 páginas •
API 1169 Exam Questions and Answers 100% Correct 
FERC - Answer- Federal Energy Regulatory Commission 
OSHA - Answer- Occupational Safety and Hazard Administration 
PHMSA - Answer- Pipeline Hazardous Materials and Safety Administration 
INGAA - Answer- Interstate Natural Gas Association of America 
CFR - Answer- Code of Federal Regulations 
EPA - Answer- Environmental Protection Act 
CERCLA - Answer- Comprehensive Environmental Response, Compensation and 
Liability Act also known as Superfund 
C...
API 1169. Study test questions test RM#2 with 100% Correct Answers
API 1169. Study test questions test 
RM#2 with 100% Correct Answers 
According to OSHA a "protective system" is defined as: - Answer- Method of protecting 
employees from cave-ins. 
Design and development inputs shall be identified and reviewed for? - Answer- 
Accuracy, completeness and lack of conflict 
The Excavator calls the One Call Center prior to excavation at least - Answer- Two 
working days nor more than ten working days 
Encroachment Area is the area where the ground disturbance occu...
- Package deal
- Examen
- • 10 páginas •
API 1169. Study test questions test 
RM#2 with 100% Correct Answers 
According to OSHA a "protective system" is defined as: - Answer- Method of protecting 
employees from cave-ins. 
Design and development inputs shall be identified and reviewed for? - Answer- 
Accuracy, completeness and lack of conflict 
The Excavator calls the One Call Center prior to excavation at least - Answer- Two 
working days nor more than ten working days 
Encroachment Area is the area where the ground disturbance occu...
API 1169 Sample Test 100% Solved 2024
API 1169 Sample Test 100% Solved 2024 
Which of the following equipment may NOT be required for a pressure test? - Answer- 
Internal line up clamps 
Before testing begins, a _____________ with explanatory notes and data should be 
prepared. - Answer- Pressure test procedure 
The pressure testing of newly constructed liquid pipelines and replaced segments of 
existing pipelines should be performed in accordance with: - Answer- ASME, Code of 
Federal Regulations and any other applicable government...
- Package deal
- Examen
- • 7 páginas •
API 1169 Sample Test 100% Solved 2024 
Which of the following equipment may NOT be required for a pressure test? - Answer- 
Internal line up clamps 
Before testing begins, a _____________ with explanatory notes and data should be 
prepared. - Answer- Pressure test procedure 
The pressure testing of newly constructed liquid pipelines and replaced segments of 
existing pipelines should be performed in accordance with: - Answer- ASME, Code of 
Federal Regulations and any other applicable government...
Final Exam 4-40 Questions and Answers 100% Pass
Learn2Serve TABC Final Assessment with 100% Correct Answers
Key Realty Exam Questions + Answers 100% Solved
A lot of the answers were missing
6630 final exam with 100% correct answers 2024
Sport First Aid 5th Edition Exam Questions and Answers 100% Pass