All 14 resultados
Ordenador por
![Test Bank for Modern Database Management, 13th Edition, Jeff Hoffer, Ramesh Venkataraman, Heikki Topi ISBN: 9780134877006 Chapter 1-14 Complete Guide.](/docpics/4832770/6603011e1031a_4832770_121_171.jpeg)
-
Test Bank for Modern Database Management, 13th Edition, Jeff Hoffer, Ramesh Venkataraman, Heikki Topi ISBN: 9780134877006 Chapter 1-14 Complete Guide.
- Examen • 374 páginas • 2024
-
- $16.99
- + aprende más y mejor
Test Bank for Modern Database Management, 13th Edition, Jeff Hoffer, Ramesh Venkataraman, Heikki Topi ISBN: 9780134877006 Chapter 1-14 Complete Guide. TABLE OF CONTE NTS I. The Context of Database Management 1. The Database Environment and Development Process II. Database Analysis and Logical Design 2. Modeling Data in the Organization 3. The Enhanced E-R Model 4. Logical Database Design and the Relational Model III. Database Implementation and Use 5. Introduction to SQL 6. Advanced SQL 7. Datab...
Provide questions for homework solutions in another files from chapter to 8 chapter 12
![HW_questions_Chap2 to7_Engineering Economics.pdf](/docpics/6413903c57e8a_2480503.jpg)
-
HW_questions_Chap2 to7_Engineering Economics.pdf
- Otro • 9 páginas • 2023
- Disponible en paquete
-
- $5.49
- + aprende más y mejor
Provide questions for homework solutions in another files from chapter 2 to chapter 7
![HW11_Sensitivity Analysis_Engineering Economics](/docpics/64138cba00fbe_2480383.jpg)
-
HW11_Sensitivity Analysis_Engineering Economics
- Otro • 5 páginas • 2023
-
- $2.99
- + aprende más y mejor
Sensitivity analysis is an important tool in engineering economy that is used to determine how changes in input variables affect the output of an economic analysis. It involves varying one or more of the input variables in a model to determine the effect on the output.
![HW3_Cost Concepts and Design Economics_EngEconomics](/docpics/64138cc4c514f_2480429.jpg)
-
HW3_Cost Concepts and Design Economics_EngEconomics
- Otro • 3 páginas • 2023
- Disponible en paquete
-
- $2.99
- + aprende más y mejor
Cost concepts refer to the various types of costs that are involved in a project, including direct costs (such as labor and materials) and indirect costs (such as overhead and administration expenses). These costs are analyzed and quantified in order to determine the total cost of a project. Understanding cost concepts is important for engineers because it allows them to accurately estimate the costs associated with a project and identify areas where cost savings can be made. 
 
Design economics...
![HW12 - Chapter 7: Depreciation and Income Taxes](/docpics/64138cb77fd07_2480376.jpg)
-
HW12 - Chapter 7: Depreciation and Income Taxes
- Otro • 3 páginas • 2023
-
- $2.99
- + aprende más y mejor
It discusses the different methods of depreciation (such as straight-line, declining balance, and sum-of-the-years' digits), how to calculate depreciation expenses, and the impact of different depreciation methods on income taxes. 
 
The chapter also covers the basics of income taxes, including the different types of taxes and tax rates, tax deductions and credits, and how to calculate income tax expenses.
![HW4_Equivalence Calculations_P,F,A,N_EngEconomics](/docpics/64138cc77881e_2480435.jpg)
-
HW4_Equivalence Calculations_P,F,A,N_EngEconomics
- Otro • 2 páginas • 2023
- Disponible en paquete
-
- $2.99
- + aprende más y mejor
Equivalence calculations using the four factors - present worth (P), future worth (F), annual worth (A), and nominal rate (N) - are commonly used to compare and evaluate alternative investment options. 
 
Present worth (P) is the value today of a series of future cash flows, calculated by discounting them using a given interest rate. Future worth (F) is the value at a future time of a series of present cash flows, calculated by compounding them using a given interest rate. Annual worth (A) is th...
![HW10_Break-even analysis](/docpics/64138cbcc9a6e_2480404.jpg)
-
HW10_Break-even analysis
- Otro • 2 páginas • 2023
-
- $2.99
- + aprende más y mejor
Break-even analysis is a tool used in engineering economy to determine the point at which total revenue equals total costs, resulting in neither a profit nor a loss. The break-even point is the level of production or sales at which the total revenue generated by a product or service equals the total cost of producing it.
![HW6_Uniform and Geometric Gradients_EngEconomics](/docpics/64138cccb3a0e_2480447.jpg)
-
HW6_Uniform and Geometric Gradients_EngEconomics
- Otro • 2 páginas • 2023
- Disponible en paquete
-
- $2.99
- + aprende más y mejor
Uniform gradients are cash flows in which the payment or receipt is the same amount for each period. For example, a uniform gradient might be a series of annual payments of $10,000 over the next five years. Engineers use uniform gradient calculations to evaluate investments and financial decisions with constant cash flows. They can use the present worth factor to calculate the value of a uniform gradient, taking into account the time value of money and the interest rate. 
 
Geometric gradients, ...
![HW8_IRR (Internal Rate of Return) and Payback Period_EngEconomics](/docpics/64138cc210be2_2480417.jpg)
-
HW8_IRR (Internal Rate of Return) and Payback Period_EngEconomics
- Otro • 2 páginas • 2023
-
- $2.99
- + aprende más y mejor
IRR (Internal Rate of Return) and Payback Period are two common methods used to evaluate the financial viability of a project. 
 
IRR is a financial metric used to determine the rate at which the net present value (NPV) of a project equals zero. It represents the discount rate at which the present value of the expected cash inflows equals the present value of the expected cash outflows. A project is considered financially viable if its IRR is greater than the required rate of return. In other wo...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
Ese resumen que acabas de comprar ha hecho muy feliz a alguien. ¿También te pagan semanalmente? ¡Vende tus documentos de estudio en Stuvia! Descubre todo sobre cómo ganar en Stuvia