- Guías de estudio, Notas de estudios & Resúmenes

¿Buscas las mejores guías de estudio, notas de estudio y resúmenes para ? En esta página encontrarás 2 documentos de estudio para .

All 2 resultados

Ordenador por:

NCCCO MOBILE CRANE Questions and  Correct Answers | Latest Update
  • Examen

    NCCCO MOBILE CRANE Questions and Correct Answers | Latest Update

  • What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom  c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8%  a. 3. The load line of the crane you're operating contacts an energized po...
  • Metric
    $13.99 Más información
NCCCO MOBILE CRANE 2024 – 2025 LATEST UPDATE WITH ALL QUESTIONS AND CORRECT ANSWERS GRADED A+
  • Examen

    NCCCO MOBILE CRANE 2024 – 2025 LATEST UPDATE WITH ALL QUESTIONS AND CORRECT ANSWERS GRADED A+

  • NCCCO MOBILE CRANE 2024 – 2025 LATEST UPDATE WITH ALL QUESTIONS AND CORRECT ANSWERS GRADED A+ A long boom crane at a short radius and out of level by 300 can see a reduction incapacity by as much as: - ANSWER-50% A multi crane lift shall require - ANSWER-Critical lift plan, reduction of gross capacity by 25% and one designated person in charge. A signal person shall be ________________. - ANSWER-designated person, tested According to ANSI B30.5, hand signal chart shall be posted where? - A...
  • sammuriithi
    $14.49 Más información
Y así es como ganas dinero extra
¿Sabías que, de media, un vendedor en Stuvia gana 76 euros al mes con la venta de recursos de estudio? Hmm, pista, pista.