CLC 222 Module 3 Exam Contract Management Questions and Answers (2022) (Verified Answers) 
 
CLC 222 Module 3 Exam: Contract Management 
 
•	When reviewing the contract, which of the following shall be reviewed for technical and contractual understanding? (Select all that apply) 
o	Incorrect: The Statement of Work 
•	If the COR is monitoring the contract and notices that most of the deliverables are late, this could be an indicator of a problem with the contractor's ability to perform the c...
- Examen
- • 2 páginas's •
-
CLC 222 Module 3•CLC 222 Module 3
CLC 222 Module 3 Quiz 
The Contracting Officer's Representative needs to be careful when giving technical direction to the 
contractor that they do not provide Improper Technical Direction which include which of the following? 
Failing to take action in the face of late or poor performance. 
The main purpose for the COR to understand the contract and how it is organized is to be aware of all 
contractual requirements and deliverables. This knowledge helps the COR track contractor performance ...
- Examen
- • 2 páginas's •
-
CLC 222 Module 3•CLC 222 Module 3
CLC 222 Module 3 Exam: Contract Management 
 
•	When reviewing the contract, which of the following shall be reviewed for technical and contractual understanding? (Select all that apply) 
o	Incorrect: The Statement of Work 
•	If the COR is monitoring the contract and notices that most of the deliverables are late, this could be an indicator of a problem with the contractor's ability to perform the contract. 
o	Correct: True 
•	A bilateral modification is used to. 
o	Correct: All of these ...
- Examen
- • 2 páginas's •
-
CLC 222 Module 3•CLC 222 Module 3
CLC 222 Module 3 Exam: Contract Management 
 
•	When reviewing the contract, which of the following shall be reviewed for technical and contractual understanding? (Select all that apply) 
o	Incorrect: The Statement of Work 
•	If the COR is monitoring the contract and notices that most of the deliverables are late, this could be an indicator of a problem with the contractor's ability to perform the contract. 
o	Correct: True 
•	A bilateral modification is used to. 
o	Correct: All of these ...