INSPECTOR'S EXAM
When must a reference line extend the full length of a bottom side rail?
A. When there are two or more areas of damage on the bottom side rail
B. When there is a sharp bend in the bottom side rail
C. When there is a bowing over the entire bottom side rail D. When
there is additional damage to the bottom side rail so that the reference
line cannot be positioned over the ends of the damage - ANSWERS-C.
When there is a bowing over the entire bottom side rail
Which of the following is NOT a transverse structural member of the
container?
A. Front sill B. Tunnel rail
C. Rear header
D. Crossmember - ANSWERS-B. Tunnel rail
A steel corner fitting is being replaced. To ensure better weld
penetration, IICL recommends that the edges of parts adjacent to the
corner fitting be ground to a minimum bevel of? A. 30 degrees B. 45
degrees
C. 55 degrees D. 60 degrees - ANSWERS-B. 45 degrees
END OF
PAGE
1
, IICL CONTAINER LATEST
INSPECTOR'S EXAM
Which of the following components is sometimes placed longitudinally
in the container to support plywood flooring? A. Transverse bow B.
Gusset
C. Hat section center spacer
D. Threshold plate - ANSWERS-C. Hat section center spacer
Assuming owner and environmental regulations permit, which of the
following procedures is NOT recommended for repairing tarpaulins or
open top containers? A. Cleaning the area to be covered with acetone or
mineral spirit B. Using a heat gun to fuse a patch to the tarpaulin C.
Sewing on a patch of the same material as the tarpaulin D. Repairing a 6
mm (1/4 in ) pin hole with an epoxy compound - ANSWERS-C. Sewing
on a patch of the same material as the tarpaulin
Which of the following is an example of a plank floor condition
requiring repair AND which should be considered as damage?
A. A crack or split with no evidence of impact, which leaks light
B. A crack or split with a sign of impact which does not leak light
C. A crack or split, adjacent to a dented bottom rail, which leaks light
D. A crack or split, with no evidence of impact, with a loose piece -
ANSWERS-C. A crack or split, adjacent to a dented bottom rail, which
leaks light
END OF
PAGE
2
, IICL CONTAINER LATEST
INSPECTOR'S EXAM
Welds to corner fittings should be made with?
A. CO2 semi-automatic welding
B. Low hydrogen welding rods
C. Fully automatic welding
D. Arc welding - ANSWERS-B. Low hydrogen welding rods
All of the following procedures are required EXCEPT
A. Weld smoke, spatter, etc. must be removed to permit adhesion of
paint
B. The damaged component(s) must be restored as close as possible to
original size and profile
C. Welds must be examined using radiographic or magnetic particle
non-destructive testing equipment
D. Replacement steel components must be painted with coating
compatible with that originally applied to the container - ANSWERS-C.
Welds must be examined using radiographic or magnetic particle non-
destructive testing equipment
END OF
PAGE
3
, IICL CONTAINER LATEST
INSPECTOR'S EXAM
Where should the reference line be placed in order to determine
repairworthiness of a crossmember flange that is bent upwards?
A. Along the inside lower formed edge of the crossmember
B. Spaced out from the crossmember web
C. On the outermost flange surface along the full crossmember length
D. No measurement is necessary - ANSWERS-D. No measurement is
necessary
The damaged top rail X below is to be repaired by sectioning. Care must
be taken to ensure that damage area X is NOT cut less than a minimum
of
A. 50mm (2 in)
B. 100mm (4 in)
C. 150mm (6 in)
D. 200mm (9 in) - ANSWERS-C. 150mm (6 in)
Rework of previously straightened panels is required when
A. evidence of considerable hammer marks is present
B. the owner's policy requires repair
END OF
PAGE
4