which of the following statements applies to facias? - ANSWER--Hanger covers should
be installed after the interlock and door adjustments have been completed
When installing Hostway doors, what is the purpose of the sight guard? - ANSWER--
Used to provide a clean door edge that blocks the Hostway from publics view
You have received a large shipment of doors for a high-rise installation and have to get
them stored properly. Which of the following statements is correct? - ANSWER--Store the
doors vertically on the long edge
When setting sills, which of the following statements applies? - ANSWER--Worth the
effort to make a template to determine sill locations on a high-rise
When setting sills in compliance with the ASME rules, what is the minimum
clearance allowed between the platform sill and Hostway sill? - ANSWER--½ inch
When setting sills in compliance with ASME rules, what is the max clearance allowed
between the platform sill and hoisway sill? - ANSWER--1 ½ inch
When setting sills, which of the following must be done? - ANSWER--If rough spots
exist on the roughed floor, set the sill to finished floor height to account for thickness
of material
You are installing a door frame, which of the following statements applies? - ANSWER-
- Use plumb lines hanging from magnets to plumb the side frames
,After installing entrances frames are prior to the blocks being installed, what is the next
step in the procedure? - ANSWER--Place a spreader board with cloth or paper on the ends
halfway up the frame between side jams
Ground (515 pg. 26) - ANSWER--What does the symbol shown below represent?
3 (555 pg. 26) - ANSWER--How many turns of safety rope must remain on the safety
drum after a rated load and rated speed test of a winding drum operated safety?
rail jack bolts (555 pg. 16) - ANSWER--Proper adjustment of which of the following
can reduce
the effects of building compression on an elevator installation?
Liquidtight Flexible Metal Conduit (505 pg. 6) - ANSWER--What type of flex would be
used to pipe a switch in a wet location?
door clutch (530 pg. 30) - ANSWER--Which of the following components is used to
engage and
couple the car door to the hoistway door during opening and closing?
100 feet (510 pg. 10) - ANSWER--On high rise of raceways, the wires must be supported
at least how many feet?
#14 (505 pg. 36) - ANSWER--What is the minimum size wire allowed be code for
wiring 100 VAC lighting circuits to elevator cars?
raceway (505 pg. 1) - ANSWER--What is the metal enclosure that furnishes protection
for electrical wire called?
, 42 inches - ANSWER--What is the minimum height of a barricade placed around as
open hoistway?
360 degrees - ANSWER--When bending conduit, what is the maximum number of
bends in degrees between access points?
proximity devices (535 pg. 23) - ANSWER--Which of the following would be used to
automatically reopen the doors without physical contact of power operated vertically
sliding freight elevator doors?
It must be tamper proof to prevent override of the door contacts (535 pg. 9) - ANSWER--
Which of the following is a requirement that must be met when interlocks are installed
on freight elevators?
The cam must apply a force that is double that required for normal interlock operation
(515 pg. 26) - ANSWER--When setting up a retiring cam for a freight elevator, which of
the following statements is correct?
keeper (535 pg. 19) - ANSWER--What device is installed to hold the vertically sliding
biparting
freight doors mechanically closed?
They must be installed on all dumbwaiters (545 pg. 19) - ANSWER--Which of the following
statements is correct for dumbwaiter installations that use mechanical locks and
electrical contacts?
They are required at the terminal landings when the rise is 25 feet or greater (545 pg.4)
- ANSWER-- What is the requirement for hoistway access switches for dumbwaiters?
The 110 VAC lighting circuit (510 pg. 46) - ANSWER--What terminals in the hoistway
junctions box could most likely be hot even with the main line disconnect open?