1. Splices in rall tracks shall have Smooth Joints
2. Hydraulic systems should have their proper fluid lev- Daily
el checked
3. If power fails during operations, the following Do your best to finish mov-
shouldn't apply ing load where it was desig-
nated to go
4. If load is undetermined who is to find out if load Person responsible for lift
weight does not exceed crane rating at radius at
which the load is to be lifted
5. Where should climbing instructions be kept ON Site
6. All climbing operations shall be performed under the Qualified person
supervision of
7. When cranes are erected, load limiting devices shall Before crane is placed in
be tested for proper setting and operation service
8. Hooks shall be equipped with latches unless the ap- Impractical
plication makes the use of the latch
9. Size and position of signs or panels must satisfy the Manufacturer
limitations of
10. Fall prevention measures are needed for working at To a fall of 6ft or more
locations where you are exposed
11. Travel distance on hand levers shall not be greater than 14 inches from neutral
position
, NCCCO tower crane Exam Newest 2025 Complete Questions And Corre
Detailed Answers (Verified Answers)|Already Graded A+
12. For power lines rated 175KV the minimum clearance 15ft
between the lines and any part of the crane or load
is
13. All controls shall be tested by the operator at the start of new shift
14. Before each climbing operation all load members of Inspected
the support system shall be
15. Chain slings are required to be ID tagged
16. Welding on loads suspended by the crane can only Insulated slings
be done if the load has
17. How much does an average cubic yard of concrete 4,000 lbs
weight
18. Main power switch for tower crane is At base of crane
19. Items not listed in the frequent inspection checklist Hydraulic pumps and valves
are for excessive wear or dam-
age
20. When is it necessary to determine that there is Personnel Lift
no practical alternative way to perform the needed
work or to gain access to the area
21. Each series of voice signals shall contain three ele- Function and Direction - Dis-
ments stated in the following order tance and speed - Function
stop
22. When lifting personnel communication shall be Person(s) being lifted - Op-
maintained between three of the next four erator - Signal person
, NCCCO tower crane Exam Newest 2025 Complete Questions And Corre
Detailed Answers (Verified Answers)|Already Graded A+
23. The condition when the tower load block or hook Two-blocking
assembly comes in contact with the upper
24. Load bearing members of the climbing and support Climbing operation
system shall be inspected before each
25. Where shall a wind velocity indicating device be At or near the top of crane
mounted
26. A velocity readout shall be provided At the operators station
27. The area inside the self erecting tower cranes tail Barricaded
swing must be
28. The self erecting tower crane must be properly National electric code (NEC)
grounded according with the
29. Self Erecting tower crane erection must be per- Qualified person
formed by
30. Extensive planning must occur before a self erecting Delivery, set up, erection and
tower crane arrives on the job site. The plan should dismantle - Lifting opera-
be divided into two major sections as follows tions
31. According to ASME B30.3 the minimum wraps to be 3
left on a hoist drum are
32. How much does a cubic foot of steel weigh 490lbs
33. When operating a tower crane and there is an un- Engage emergency stop
controlled movement, the operator should