1. What area(s) of consideration should the AV professional address with the
client regarding building structure and AV service issues?
Answer Ensure adequate power source(s), ensure AV program source access.
2. How is an AV project estimate created for a client?
Answer Calculating goods, labor, materials and other projected costs, plus a markup.
3. What is the diagram shown in the exhibit used for in AV management activi-
ties?
Answer Helps in sequencing and scheduling project events.
4. Detailed descriptions of specific services, experience required for proposed
project staff and AV drawings may be included when creating a(n)?
Answer Request for proposal (RFP) for labor and service providers
5. Which pieces of equipment are necessary for testing leads and evaluating an
audio signal chain?
Answer A Signal Generator and Signal Analyzer
1/
18
,6. When commissioning for video display installation, how will the AV technician
test to ensure that the video display system is working properly?
Answer Confirm brightness, contrast and color adjustments using SMPTE PLUGE Pattern.
7. What type of diagram or drawing is pictured in the exhibi
Answer A Block Diagram
8. If an AV professional believes that an AV system requires its own VLAN (Vir-
tual Local Area Network),what information must be communicated to the AV
professional's IT counterparts?
Answer Why the VLAN is necessary.
9. Noise in a room can be a distraction to users and have an impact on the
effectiveness of an AV system. Which of the following generates mechanical
and structural noise?
Answer HVAC fans, dittusers and air handlers.
10. What would mechanical drawings be used to determine on a site visit?
Answer Loca- tions of heating, plumbing and ventilation in a venue.
2/
18
, 11. If the text size in a projected presentation is 3 inches (76 mm), then the viewer
should not be farther away than for reading the text?
Answer 450 inches (11,400 mm)
12. One major difference between the Service Level Agreement process and the
traditional Program Report is the SLA focuses upon?
Answer Measurement of service through monitoring procedures.
13. When would an AV contractor need to consider an IPv6 deployment instead
of IPv4?
Answer On a contract with a government agency where it is mandated.