Phases Of Road Construction - CORRECT ANSWER -The earthworks (Cut and Fill &
preparation of soil)
-The construction of the pavement
Haul Distances For Mobile Systems - CORRECT ANSWER Dozer 150m
Wheel Loaders 200m
Scraper 3000m
Articulated Truck 4500m
Rear Dump Truck 9000m
Wagon 11000m
Other Kinds of Plant and Equipment - CORRECT ANSWER Water distributor, drill &
blast equipment, paving machines, bitumen sprayers & equipment, dewatering systems
Subgrade Strength - CORRECT ANSWER -Determines the thickness of the pavement
needed
-Can be achieved by 3 ways
-California Bearing Ration (C.B.R)
CBR for all soils except lean clays, sandy clay below 10 - CORRECT ANSWER CBR
= 292/(DPI^1.12)
CBR for soils with CBR less than 10 - CORRECT ANSWER CBR =
(1/(0.0170019*DPI)^2
CBR for fat clays soils - CORRECT ANSWER CBR = (1/(0.002871*DPI)
, Subgrade Strength - Good quality material, just rip and re-compact - CORRECT
ANSWER >15
Subgrade Strength - moderate quality, needs 150 mm of CBR>15 above - CORRECT
ANSWER 7 to 15
Subgrade strength - fair quality needs 150 mm of CBR>15 + 150mm of CBR>7 above -
CORRECT ANSWER 3 to 7
Subgrade Strength - poor material, special treatment - CORRECT ANSWER <3
Why do we need subsoil drainage? - CORRECT ANSWER Capillary action and
seepage
Soil Stabilisation - CORRECT ANSWER -Treatment of the soil that increases the
strength, means include cement or bitumen
Pavement Material - Flexible Pavement - CORRECT ANSWER Unbound granular or
stabilised materials or asphalt
Pavement Material - Rigid Pavement - CORRECT ANSWER -Concrete pavement with
joints or steel reinforcements
-Relatively high strength concrete (30)
-Range of subbase materials (lean mix concrete, cement stabilised crushed rock, unbound
granular materials)
What are contraction joints? - CORRECT ANSWER Control cracking in rigid
pavements from shrinkage, contraction, temperature and moisture changes.
They allow and control movements.
Dowel bars are used to transfer loads across the joints